November 2026 Data Center Energy Report

Power and grid intelligence across 331 scored markets, refreshed daily. Verdict shifts, BUILD/AVOID watch lists, interconnection-queue depth, and the latest published PJM and ERCOT fuel mix — machine-readable, CC-BY-4.0.

331Markets scored (DCPI)
26BUILD verdicts
103CAUTION verdicts
202AVOID verdicts
Executive summary · auto-generated · claude-haiku-4-5-20251001 · 2026-11-22

The power market is decisively constrained: 202 of 331 markets (61%) warrant avoidance, while only 26 (8%) qualify as build-ready. SPP emerges as the standout performer with 100% build coverage and an average excess capacity score of 68.9, making it the only ISO delivering consistent greenfield optionality. Within SPP, North Kansas City leads with a 71.6 composite and 12.9-month time-to-power, offering the lowest execution friction in a tight market. ERCOT's Texas footprint, despite iconic renewable penetration at 48.4%, ranks bottom-tier at 5.9% build coverage—Midland–Odessa's exceptional 80.6 score notwithstanding—weighed down by a 31.1-month average TTP and a staggering 51.4-point constraint score. MISO deteriorates further to 2.7% build, crippled by Brandon and Jackson markets posting 24.7 and 24.1 constraint ratings respectively. The verdict skew toward AVOID is structural, not cyclical: 1,459.4 GW sits in the US generation interconnection queue while ERCOT's large-load queue alone carries 474 GW (90% data-center attributed), creating a multi-year supply-demand inversion.

This distribution signals sustained power scarcity through Q1 2027. Queue depth and TTP metrics confirm the squeeze will persist: even SPP's 16.0-month average TTP reflects 2026-era overshooting, while ERCOT and CAISO both clock 31.1 months, effectively locking new capacity behind 2.5-year development cycles. Curtailment pressure, indexed through constraint scores, averages 39.0 in WECC and 52.8 in CAISO—levels incompatible with nine-figure capex confidence. Hyperscalers hunting 2027 power must prioritize SPP's remaining parcels and ERCOT bolt-ons with pre-queue PPA coverage. Otherwise, patience on greenfield remains the prudent position: waiting for gen queue absorption (12–18 months out) will yield materially lower TTP and constraint risk than committing today to markets averaging 24-month build delays.

Top BUILD markets

MarketISOCompositeTTP (mo)
Midland–OdessaERCOT80.6—
Williston, NDMISO76.9—
CheyenneWECC74.8—
North Kansas CitySPP71.6—
GilbertWECC69.8—
MontréalHQ69.8—
TucsonWECC69.6—
ScottsdaleWECC69.2—
TempeWECC69.0—
Kansas CitySPP68.9—

Top AVOID markets

MarketISOConstraint
BillingsWECC—
Québec CityHQ—
BrandonMISO—
JacksonMISO—
SheridanWECC—
BismarckMISO—
Sioux FallsMISO—
FargoMISO—
Sioux CityMISO—
ProvidenceISONE—

ISO health rollup

ISOMarketsBUILD %Avg ExcessAvg ConstraintAvg TTP (mo)
AESO20%———
CAISO1414%———
CEN10%———
ERCOT176%———
HQ250%———
ISONE110%———
MH10%———
MISO373%———
NORDPOOL40%———
NYISO90%———
ONS20%———
PJM80%———
CC-BY-4.0 Licensed under Creative Commons Attribution 4.0 International. Quote freely with attribution to DC Hub.

DC Hub · dchub.cloud · Markdown · JSON · Sample landing

📩 Get the monthly energy report by email
Fresh DC Hub data-center intelligence in your inbox. No spam — unsubscribe anytime.
⬇ Download the full dataset— enter your email above first