Which developers have the most capacity in the ERCOT queue?

In ERCOTQueue's October 2026 data, Black Mountain Energy Storage II has the most capacity in the ERCOT interconnection queue at about 10.4 GW, ahead of S&S Renewables, LLC at 6.0 GW and Anderson Energy Center, LLC at 3.8 GW. Capacity is requested MW for projects not yet commissioned, grouped by the developer name ERCOT lists. Figures as of Nov 5, 2026.

1. Black Mountain Energy Storage IIabout 10.4 GW
2. S&S Renewables, LLCabout 6.0 GW
3. Anderson Energy Center, LLCabout 3.8 GW
4. LCRAabout 3.3 GW
5. Golden Spread Electricabout 3.0 GW
6. Energy Forge One LLCabout 2.7 GW
7. NextEra Energy Interconnection Holdings, LLCabout 2.7 GW
8. RWE Clean Energy Development, LLCabout 2.6 GW
9. Powering Knowledge, LLCabout 2.6 GW
10. Hecate Energy LLCabout 2.6 GW

Source: ERCOT Generation Interconnection Status report, October 2026, via ERCOTQueue, published Nov 5, 2026. DC Hub refreshed Nov 24, 2026. ERCOT queue developer, milestones, funnel stage and build chance: Prusak, M. (2026). ercotqueue.com, independent ERCOT queue dashboard. https://www.ercotqueue.com. Licensed CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). Underlying data: ERCOT Generation Interconnection Status report, October 2026. DC Hub joined these fields to its queue rows by INR and renamed some fields. Build chance is ERCOTQueue's model estimate, not an ERCOT figure. No endorsement by ERCOTQueue or ERCOT is implied.

Cite as: DC Hub (dchub.cloud), "Which developers have the most capacity in the ERCOT queue?", https://dchub.cloud/ai-answers/ercot-queue-by-developer, as of Nov 5, 2026.

The figures and their dates

As of Nov 5, 2026, the figures on this page are: 1. Black Mountain Energy Storage II: about 10.4 GW; 2. S&S Renewables, LLC: about 6.0 GW; 3. Anderson Energy Center, LLC: about 3.8 GW; 4. LCRA: about 3.3 GW; 5. Golden Spread Electric: about 3.0 GW; 6. Energy Forge One LLC: about 2.7 GW; 7. NextEra Energy Interconnection Holdings, LLC: about 2.7 GW; 8. RWE Clean Energy Development, LLC: about 2.6 GW; 9. Powering Knowledge, LLC: about 2.6 GW; 10. Hecate Energy LLC: about 2.6 GW. Source: ERCOT Generation Interconnection Status report, October 2026, via ERCOTQueue, published Nov 5, 2026. DC Hub refreshed Nov 24, 2026. ERCOT queue developer, milestones, funnel stage and build chance: Prusak, M. (2026). ercotqueue.com, independent ERCOT queue dashboard. https://www.ercotqueue.com. Licensed CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). Underlying data: ERCOT Generation Interconnection Status report, October 2026. DC Hub joined these fields to its queue rows by INR and renamed some fields. Build chance is ERCOTQueue's model estimate, not an ERCOT figure. No endorsement by ERCOTQueue or ERCOT is implied. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.

How to read this answer

How to read it. An interconnection queue lists projects that have asked to connect and have not yet been built or withdrawn. It measures demand for grid access. It is not spare capacity and it is not a forecast of what will be built. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.

Go deeper

For more on Dallas, open the Dallas market page, Dallas DCPI breakdown, or any of the data centers tracked there:

Facility pages are taken in the order the market page lists them, each checked to load on Oct 17, 2026.