Electric Reliability Council of Texas · every queued generator and load position, from the same interconnect_queue feed our REST API and MCP tools serve. Queue positions through 2033-06-01.

1,893Queued projects
451 GWTotal queued capacity
451 GWActive (non-terminal status)
0.1 GWClassified data-center load
32.6 moTypical time-to-power (filings-derived)

Methodology: counts include every queued position; historically most queued MW never reaches commercial operation. "Active" excludes withdrawn / cancelled / terminated / suspended / in-service statuses. This feed publishes no commercial-operation dates — we do not fabricate them.

Queued capacity by fuel / type

Fuel / typeProjectsCapacity
OTH940166.4 GW
SOL648156.3 GW
GAS13776.7 GW
WIN16249.1 GW
NUC11.3 GW
WAT11.2 GW
OIL30.2 GW
HYD10.1 GW

Queue status breakdown

StatusProjectsCapacity
active1,893451.3 GW

25 largest queued projects

ProjectCountyFuelMWStatusQueue date
BM Great Rock Energy CenterLeonGAS1,981active2029-05-15
Prairie Ridge (Gas - CC)FranklinGAS1,660active2032-06-01
Hecate Energy Orem WindBrazoriaWIN1,542active2030-06-01
Aegle PowerCameronGAS1,536active2027-07-30
Big Canyon WindPecosWIN1,500active2030-07-01
Caldwell County Energy CenterCaldwellGAS1,500active2030-04-30
Liberty Thermal Energy CenterHillGAS1,400active2032-07-01
Bullock GasHillGAS1,400active2032-07-01
BasRanch (TEF - Due Diligence)WardGAS1,350active2028-12-01
Willow Oak GasJeffersonGAS1,350active2030-01-01
STP Unit2 High Pressure Turbine UpgradeMatagordaNUC1,337active2027-04-23
The Giant Arc IPecosGAS1,300active2030-04-08
Moon HammerWheelerGAS1,300active2030-11-30
The Giant Arc-IIPecosGAS1,300active2030-04-11
Sandow Lakes Energy StationMilamGAS1,292active2028-04-01
Aurelius 3 Natural GasDeaf SmithGAS1,275active2029-06-30
Jewett Energy Center 1 GasFreestoneGAS1,274active2029-11-01
Thunder Bird 2 GasJackGAS1,274active2031-06-14
Thunder Bird 1 GasJackGAS1,273active2030-06-14
Cerulean Phase 2 – CCGTVictoriaGAS1,265active2031-10-17
Mule Deer Run GasAndersonGAS1,263active2031-07-01
Mule Deer Run Gas IIAndersonGAS1,263active2032-07-01
Mule Deer Run Gas IIIAndersonGAS1,263active2032-07-01
NRG Prairie Energy CenterHillGAS1,253active2030-12-31
Tolar Energy CenterHoodGAS1,252active2030-06-10
Query this queue programmatically.

REST: GET /api/v1/interconnection-queue/by-iso?iso=ERCOT · MCP: get_interconnection_queue / get_refined_queue at dchub.cloud/mcp. Free tier works keyless; public pricing raises the caps, or talk to sales for bulk export.

API docs Live ERCOT telemetry →