How large is the PJM interconnection queue?

PJM's generation interconnection queue is 373 GW as of Nov 23, 2026, as published by the ISO. The typical time to power is about 50 months (ISO-level).

Grid operatorPJM
Generation queue373 GW
Typical time to powerabout 50 months (ISO-level)

Source: PJM cycle + serial service request status (active generation requests, sum of MFO), published Nov 23, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.

Cite as: DC Hub (dchub.cloud), "How large is the PJM interconnection queue?", https://dchub.cloud/ai-answers/pjm-interconnection-queue-data-centers, as of Nov 23, 2026.

The figures and their dates

As of Nov 23, 2026, the figures on this page are: Grid operator: PJM; Generation queue: 373 GW; Typical time to power: about 50 months (ISO-level). Source: PJM cycle + serial service request status (active generation requests, sum of MFO), published Nov 23, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.

How to read this answer

How to read it. An interconnection queue lists projects that have asked to connect and have not yet been built or withdrawn. It measures demand for grid access. It is not spare capacity and it is not a forecast of what will be built. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.