Power availability in Katy, TX: DCPI verdict CAUTION, composite score 45.8 of 100, as of 2026-11-18. Source: DC Hub.
Data Center Market Deep-Dive · 181 words · generated 2026-11-14 from live DC Hub data · DCPI live as of 2026-11-18
Katy, TX has 100 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-18. By listed capacity the largest operators are ServerFarm (100 MW).
| Status | MW |
|---|---|
| Operational | 100 |
| Total listed | 100 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-18. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it can be larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
One tracked site reports operational capacity, though market-wide MW totals remain undisclosed. The market shows measurable presence but limited transparency on power headroom and installed base.
This combination means new power procurement will require site-specific negotiation with utilities and careful analysis of interconnection queues; blanket access to surplus capacity cannot be assumed. Operators should expect utility engagement timelines measured in months rather than weeks.
No recent deals have been tracked in Katy, and the operator base remains distributed across four separate entities with minimal consolidation visible. Katy's smaller footprint and quieter transaction history position it as secondary to Houston proper but within the same capital-aware geography.
| Facility | Operator | Status | MW |
|---|---|---|---|
| ServerFarm HTX1 Houston | ServerFarm | Operational | 100 |
| EdgeConneX Houston (EDCHOU01) | EdgeConneX Inc. | Operational | |
| Element Critical Houston HOU1 | Element Critical, LLC | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Texas.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Katy, TX: 100 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/katy/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-14, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load