Element Critical Houston HOU1 — Katy Data Center

Element Critical Houston HOU1 is a data center operated by Element Critical, LLC in Katy, TX, US. The facility is currently operational. It sits in the Katy data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 31.7-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.

Status
Operational
Market
Katy
State
TX
Country
US

Market intelligence

BUILD

Data Center Power Index verdict for Katy — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Katy — the market this facility sits in (full deep-dive →).

Katy's data center market remains nascent but strategically positioned, with 100 MW distributed across five facilities operated by a balanced mix of regional and specialized players. The tracked operator roster—EdgeConneX operating two separate facilities, Element Critical, ServerFarm, and Skybox—reflects neither heavy consolidation nor dominant single-player control. This fragmentation differs markedly from mature markets where tier-one operators control 60%+ of supply; Katy's 20 MW average per operator suggests room for both consolidation and greenfield entry. The DCPI verdict of BUILD, driven by excess-power scoring of 65/100 against constraint scoring of 43/100, translates directly to a favorable risk-return profile for capacity-focused investors. The excess-power reading indicates sufficient regional power infrastructure and grid headroom to support expansion without triggering the…

Location

Area Katy, TX, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketKaty
Grid operatorERCOT
Data Center Power IndexBUILD
Est. time to power31.7 months
LocationKaty, US
Nearest substationwithin 1 km

Power generation nearby

DC Hub tracks 53 operating generating units totalling 8,668 MW within about 50 km of Katy, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas4,819 MW · 40 units · 56%
Coal2,697 MW · 4 units · 31%
Utility-Scale Solar1,152 MW · 9 units · 13%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Katy tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="element-critical-llc-element-critical-houston-hou1-7cc10d46" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind