Indianapolis, IN data center market

Power availability in Indianapolis, IN: DCPI verdict CAUTION, composite score 43 of 100, as of 2026-11-18. Source: DC Hub.

Data Center Market Deep-Dive · 244 words · generated 2026-11-14 from live DC Hub data · DCPI live as of 2026-11-18

DCPI Score43.0/100
MW, all listings1,310sum of the sites that report MW; most do notany status, unverified listings included
VerdictCAUTION

Indianapolis, IN at a glance

Indianapolis, IN has 10 MW operational and 300 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-18. By listed capacity the largest operators are Amazon Web Services (300 MW) and 365 Data Centers (10 MW).

Capacity by status, as of 2026-11-18
StatusMW
Operational10
Under construction300
Total listed310

Developers building or planning in Indianapolis, IN

OperatorUnder construction MWPlanned MW
Amazon Web Services300

Source: DC Hub (dchub.cloud), facility records as of 2026-11-18. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it can be larger than Total listed.

Colocation lease rates in Indianapolis, IN

Broker lease rates (CBRE/JLL): withheld from the free view; the Data Center Power Index (DCPI) verdict for this market is free at dchub.cloud/dcpi. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: DC Hub estimate. Between Chicago (CBRE North America Data Center Trends H1 2026 (250+ kW): (figure withheld)) and Columbus; IN industrial power ~9.2 c/kWh (EIA via DC Hub).

The market has recorded a recent transaction involving DC Blox valued at $2B, though deal structure details remain unclear.

The DCPI verdict of CAUTION reflects balanced but tightening conditions on new power supply. This is not a supply crisis, but incremental power expansion here will face real logistical friction.

Deal flow remains sparse in recent tracking windows. Beyond the DC Blox transaction, no other Indianapolis-specific M&A has surfaced in current records. Digital Realty has publicly signaled interest in gigawatt-scale development in Kokomo, Indiana, near Indianapolis, indicating hyperscaler appetite for the broader region's power and land profile, though no transaction has been recorded there. Local permitting visibility has improved through new municipal tracking tools for data center and infrastructure proposals, a signal that community engagement and regulatory clarity are becoming baseline operational considerations.

Regional context shows Digital Realty similarly pursuing land-tied expansion in Kansas City around AI-driven infrastructure, suggesting a pattern of hyperscaler site optionality across Midwest markets rather than concentrated commitment to any single metro.

Data centers in Indianapolis, IN

FacilityOperatorStatusMW
AWS Indiana CampusAmazon Web ServicesUnder Construction300
365 DC Indianapolis365 Data CentersOperational10
DataBank Indianapolis (IND2)DataBankOperational
IUPUI Informatics & Communications Technology ComplexIndiana UniversityOperational
Lifeline EastgateLifeline Data CentersOperational
LightBound IND1LightBoundOperational
Netrality - Indy Telcom Center - 701 W. HenryNetrality Data CentersOperational
Netrality - Indy Telcom Center - 733 W. HenryNetrality Data CentersOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Indiana.

More on Indianapolis, IN

Email me when the Indianapolis, IN DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Indianapolis, IN: 1,310 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/indianapolis/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-14, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load