Oracle/OpenAI/Vantage Stargate Wisconsin

Oracle/OpenAI/Vantage

Stargate Wisconsin is a data center operated by Oracle/OpenAI/Vantage in Port Washington, WI, US. It carries a reported power capacity of 900.0 MW and is currently under construction. It sits in the Milwaukee data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 16.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Power
900.0 MW
Status
Under Construction
City
Port Washington
State
WI
Country
US
Coordinates
43.3872, -87.8712
Address
Port Washington, WI

Market intelligence

AVOID

Data Center Power Index verdict for Milwaukee — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Milwaukee — the market this facility sits in (full deep-dive →).

Milwaukee's data center market remains nascent, with 25 tracked facilities totaling 0 MW of measured capacity—indicating either minimal hyperscale presence or a market dominated by smaller, distributed operators below standard tracking thresholds. The operator landscape is highly fragmented: five distinct entities control the measurable inventory, with Cogent Communications Milwaukee, Cyberlynk Network, Dedicated Computing Enterprise Solutions Milwaukee, and 1547 Critical Systems Realty each operating single facilities, while three additional operators remain unidentified. This fragmentation suggests a market composed largely of regional and mid-market players rather than Tier 1 providers. The DCPI verdict of CAUTION—driven by a constraint score of 36/100 paired with an excess-power score of 51/100—presents a mixed signal for acquisition-focused investors. The moderate constraint score…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketMilwaukee
Grid operatorMISO
DC Hub Power IndexAVOID
Est. time to power16.5 months
LocationPort Washington, US
Reported capacity900.0 MW

Power generation nearby

DC Hub tracks 28 operating generating units totalling 3,021 MW within about 50 km of Port Washington, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,183 MW · 11 units · 72%
Coal414 MW · 1 unit · 14%
Utility-Scale Solar302 MW · 14 units · 10%
Wind122 MW · 2 units · 4%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Port Washington tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="oracleopenaivantage-stargate-wisconsin-a80ede4c" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=oracleopenaivantage-stargate-wisconsin-a80ede4c
Schema, units and the population behind every count: https://dchub.cloud/bind