Vantage Port Washington Campus is a data center operated by Vantage Data Centers in Port Washington, WI, US. It carries a reported power capacity of 500.0 MW and is currently under construction. It sits in the Milwaukee data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 17.3-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Milwaukee — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Milwaukee — the market this facility sits in (full deep-dive →).
Milwaukee's data center footprint remains modest and fragmented, with 22 tracked facilities totaling 55 MW across a market dominated by unknown operators. Cyberlynk Network, Expedient Franklin, Expedient Milwaukee, and Cogent Communications Milwaukee each operate single facilities, reflecting a highly distributed ownership structure with no clear market leader. The absence of recent M&A activity underscores limited investor appetite and capital concentration in the region. The CAUTION verdict—driven by an excess-power score of 51/100 paired with a constraint score of 37/100—signals a market caught between stagnation and latent tension. The moderate excess-power reading suggests supply is neither critically tight nor dramatically oversupplied, but the low constraint score warns that physical, regulatory, or infrastructure headwinds exist beneath the surface. For acquisition-focused…
Published DC Hub data for this location.
Comparable facilities in Port Washington tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="vantage-data-centers-vantage-port-washington-campus-a20f048e" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=vantage-data-centers-vantage-port-washington-campus-a20f048e