Vantage Lighthouse Campus (Stargate Expansion) is a data center operated by Vantage Data Centers in Port Washington, WI, US. Its reported power capacity falls in the 1–5 GW range and it is currently planned.
Source: DC Hub facilities registry · Added , not re-checked since · Basis: cited (what this means)
Vantage Lighthouse Campus (Stargate Expansion) is one of 23 facilities DC Hub’s Milwaukee brief counts on the MISO grid. The closest tracked facility is Vantage Port Washington Campus, under 1 km away, and the nearest mapped substation is within 1 km. Read the Milwaukee market brief →
Published DC Hub data for this location.
DC Hub tracks 28 operating generating units totalling 3,021 MW within about 50 km of Port Washington, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Nearest first, by distance from this site.
execute_plan with this page's question for one dated, cited answer.
You can also query get_facility slug="vantage-data-centers-vantage-lighthouse-campus-stargate-expansion-26a8567d".
Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect:
https://dchub.cloud/connect