Aligned Salt Lake SLC-02

Unverified directory listing — This record came from a third-party directory listing that DC Hub has not verified against another source. It is shown for reference only; its status and details are unconfirmed.

Aligned Salt Lake SLC-02 is a data center operated by Aligned in West Jordan, UT, US. It carries a reported power capacity of 80.0 MW. It sits in the West Jordan data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 17.5-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Power
80.0 MW
Market
Salt Lake City
City
West Jordan
State
UT
Country
US

Market intelligence

CAUTION

Data Center Power Index verdict for West Jordan — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on West Jordan — the market this facility sits in (full deep-dive →).

West Jordan operates as a mid-scale regional hub with 315 MW deployed across six tracked facilities, anchored by Aligned Data Centers and Flexential, which together control four of the market's six sites. The market's DCPI scoring reveals a fundamental asymmetry: abundant power supply excess-power 55/100 coexists with significant operational constraints 43/100, indicating that raw capacity masks underlying friction in deployment speed, infrastructure maturity, or regulatory clearance. This surplus-meets-bottleneck dynamic creates an unusually bifurcated investment landscape where power availability alone cannot guarantee competitive lease economics or time-to-deployment. The CAUTION verdict reflects the constraint score's material weight for institutional buyers. A 43/100 constraint reading signals that operational headroom is limited relative to power supply—meaning new entrants or…

Location

Area West Jordan, UT, US

Exact location not on record.

Market & grid context

Published DC Hub data for this location.

MarketWest Jordan
Grid operatorWECC
Data Center Power IndexCAUTION
Est. time to power17.5 months
LocationWest Jordan, US
Reported capacity80.0 MW

Other data centers nearby

Comparable facilities in West Jordan tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="aligned-aligned-salt-lake-slc-02-48d0c9ac" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind