Power availability in West Jordan: DCPI verdict CAUTION, composite score 47.4 of 100, as of 2026-10-20. Source: DC Hub.
Data Center Market Deep-Dive · 271 words · generated 2026-10-19 from live DC Hub data · DCPI live as of 2026-10-20
This analysis was written on 2026-10-19, when the Data Center Power Index for this market read 47.6. The index is recomputed through the day and reads 47.4 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.
West Jordan has 175 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-10-20. By listed capacity the largest operators are Novva Data Centers (175 MW).
| Status | MW |
|---|---|
| Operational | 175 |
| Total listed | 175 |
Source: DC Hub (dchub.cloud), facility records as of 2026-10-20. Verified sites that report MW only; blank means no MW reported. The Total MW tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
West Jordan's data center market comprises six operational facilities with 315 MW of total capacity, split among four operators—Aligned, Flexential (2), Flexential Corp. (1), and Novva Data Centers (1).
The CAUTION verdict reflects a market in transition: sufficient power supply exists today, but constraint pressures are building faster than excess capacity can absorb new demand. For acquisition-focused buyers, this means due diligence must stress-test power infrastructure beyond nameplate capacity. Sellers benefit from a hardening market where demonstrated power reliability commands premium valuations. However, buyers should require detailed grid interconnection studies and backup power assessments before committing capital, as the constraint score suggests grid-tie limitations may constrain future expansion economics.
Operator concentration shows Aligned and Flexential entities controlling five of six tracked facilities—a notable consolidation pattern. The absence of recent M&A activity in West Jordan contrasts sharply with sector-wide deal momentum, where large operators continue strategic acquisitions. This inactivity creates a potential entry opportunity for mid-market operators seeking stabilized assets, though the caution rating means any incoming capital must account for power remediation costs not yet factored into market pricing. Flexential's dual presence (two Flexential facilities plus one Flexential Corp. entity) suggests the operator has pursued internal restructuring rather than external acquisition, leaving room for fresh entrants willing to navigate the constraint environment.
Forward momentum depends on whether local utility capacity can expand beyond current constraint limits—if infrastructure investments materialize on schedule, West Jordan could shift from caution to attract-mode within 12–18 months.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Novva West Jordan Campus Phase 1 | Novva Data Centers | Operational | 175 |
| Flexential - Salt Lake City/South Valley (SLC09) | Flexential Corp. | Operational | |
| Flexential Salt Lake City - South Valley | Flexential | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Utah.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
West Jordan: 315 MW tracked, any status — live, cited, and queryable by API or MCP.
Pro $99 · or $10 one-time = 1,000 API credits (1 per call, 5 for heavy tools). Pro-only tools not included.
JSON: /api/v1/markets/west-jordan/deep-dive · DCPI: /dcpi · Operators: /operators · Updated nightly