Novva West Jordan Campus Phase 1

Novva West Jordan Campus Phase 1 is a data center operated by Novva Data Centers in West Jordan, UT, US. It carries a reported power capacity of 175.0 MW and is currently operational.

Power
175.0 MW
Status
Operational
Market
Salt Lake City
City
West Jordan
State
UT
Country
US

Market intelligence

CAUTION

West Jordan

Full DCPI breakdown →

Market context

In the West Jordan market on the WECC grid, Novva West Jordan Campus Phase 1’s 175 MW is about 56% of the 315 MW DC Hub’s brief counts there. The closest tracked facility is Aligned Salt Lake (SLC-01), about 3 km away, and the nearest mapped substation is within 5 km. Read the West Jordan market brief →

Location

Area West Jordan, UT, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationWest Jordan, US
Reported capacity175.0 MW
Nearest substationwithin 5 km

Power generation nearby

DC Hub tracks 12 operating generating units totalling 1,880 MW within about 50 km of West Jordan, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,870 MW · 8 units · 99%
Utility-Scale Solar6 MW · 2 units · 0%
Wind3 MW · 2 units · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="novva-data-centers-novva-west-jordan-campus-phase-1-b2c050c3" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind