Fervo is a data center in UT, US. It carries a reported power capacity of 396.0 MW and is currently announced. It sits in the South West Jordan data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 16.3-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for South West Jordan — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on South West Jordan — the market this facility sits in (full deep-dive →).
South West Jordan currently operates four tracked facilities totaling 0 MW of capacity, representing an early-stage market with minimal incumbent infrastructure. The operator landscape is fragmented: Aligned Data Centers controls two sites, while eBay and one untracked operator each manage single facilities. No recent M&A activity has been recorded in this submarket, distinguishing it from neighboring Utah regions where large-scale development is advancing—notably Iron County's approved 640-acre, 1.35-million-square-foot campus proposal and ongoing Stratos development infrastructure expansion. The DCPI verdict of CAUTION reflects structural tension between power availability and operational constraints. The excess-power score of 55/100 indicates sufficient generating capacity in the region, yet the constraint rating of 45/100 signals meaningful limitations on utilization or transmission…
Published DC Hub data for this location.
Comparable facilities in UT tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="fervo-a6fda21d" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=fervo-a6fda21d