Power availability in Ashburn (Northern Virginia): DCPI verdict AVOID, composite score 19.8 of 100, as of 2026-10-20. Source: DC Hub.
Data Center Market Deep-Dive · 290 words · generated 2026-10-18 from live DC Hub data · DCPI live as of 2026-10-20
This analysis was written on 2026-10-18, when the Data Center Power Index for this market read 26.7. The index is recomputed through the day and reads 19.8 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.
Ashburn has 3,913 MW operational, 383 MW under construction and 255 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-10-20. By listed capacity the largest operators are Amazon Web Services (1,000 MW), Yondr Group (456 MW) and CloudHQ (444 MW).
| Status | MW |
|---|---|
| Operational | 3,913 |
| Under construction | 383 |
| Planned | 255 |
| Total listed | 4,551 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| Yondr Group | 48 | 240 |
| Prime Data Centers | 120 | |
| Compass Datacenters | 100 | |
| Compass | 60 | |
| Overwatch Capital | 35 | |
| DataBank | 20 | |
| Vantage Data Centers | 15 |
Source: DC Hub (dchub.cloud), facility records as of 2026-10-20. Verified sites that report MW only; blank means no MW reported. The Total MW tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
Asking rate range (broker report): $190–$235 /kW/mo (250-500 kW (CBRE quoted asking rate, 250+ kW N+1/Tier III)), H1 2026. Vacancy 2.0%.
Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Northern Virginia $190-235/kW/mo (link)
Ashburn hosts tracked facilities representing 8,662 MW of installed capacity, making it a mature hyperscale hub dominated by three operators: Digital Realty commands facilities, Equinix operates 20, and Amazon Web Services controls 17.
The AVOID verdict reflects a specific investor profile risk: buyers acquiring operating facilities in Ashburn face headwinds from power scarcity that compress margins and limit expansion. When constraint severity exceeds supply availability (54 vs. 45), newly deployed capital cannot scale workloads efficiently, and lease rates fail to compensate for infrastructure limitations. This dynamic particularly penalizes acquisition-stage entrants who inherit existing footprints without control over regional grid upgrades or interconnect expansion timelines.
M&A momentum remains thin relative to market size. Amazon's $427 million transaction in Ashburn represents the only recent tracked deal, suggesting that hyperscalers already holding significant deployed capacity (AWS's facilities) are consolidating rather than aggressively expanding. Digital Realty's dominant position (35 sites) reflects historical build-out completed before current constraint pressures materialized. CloudHQ's facility presence and Equinix's 20-site footprint indicate diversification strategies, but neither firm has announced major Ashburn additions. The absence of mid-market or PE-backed acquisition announcements underscores limited confidence in near-term supply relief.
Ashburn's future depends on whether Loudoun County and regional transmission planners can unconstrain power delivery faster than demand growth consumes headroom. Without visibility into specific substation upgrades or interconnect timelines, acquisition-stage investors should monitor peer activity—if Digital Realty or AWS announce material new builds, constraint signals may be easing. Until then, the facility installed base will likely serve as a mature, stable revenue platform rather than a growth vector.
| Facility | Operator | Status | MW |
|---|---|---|---|
| AWS US-East-1 Ashburn Campus | Amazon Web Services | Operational | 500 |
| Google Cloud us-east4 (N. Virginia) | Operational | 400 | |
| Yondr Loudoun County Expansion (270 acres) | Yondr Group | Planned | 240 |
| Aligned Ashburn Campus | Aligned | Operational | 150 |
| CloudHQ Ashburn | CloudHQ | Operational | 150 |
| Equinix DC1-DC15 | Equinix | Operational | 150 |
| Stack Northern Virginia | Stack Infrastructure | Operational | 150 |
| QTS Ashburn Mega Campus | QTS | Operational | 130 |
| Prime Data Centers Ashburn | Prime Data Centers | Under Construction | 120 |
| Prime Virginia | Prime Data Centers | Operational | 120 |
| Yondr Northern Virginia | Yondr Group | Operational | 120 |
| Compass Loudoun County Campus | Compass Datacenters | Under Construction | 100 |
| Compass Loudoun Virginia | Compass Datacenters | Operational | 100 |
| Microsoft Ashburn | Microsoft | Operational | 100 |
| RagingWire VA Campus | RagingWire | Operational | 100 |
| CloudHQ Ashburn VA2 | CloudHQ | Operational | 96 |
| CyrusOne Ashburn | CyrusOne | Operational | 75 |
| CloudHQ Ashburn VA1 | CloudHQ | Operational | 72 |
| Vantage Ashburn V2 | Vantage Data Centers | Operational | 72 |
| Vantage Ashburn V1 | Vantage Data Centers | Operational | 64 |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Virginia.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Ashburn: 8,662 MW tracked, any status — live, cited, and queryable by API or MCP.