DCPI / Markets / Ashburn

Ashburn

PJM · VA · UPDATED 2026-11-29

Ashburn (PJM): Data Center Power Index (DCPI) 20.0/100, AVOID, as of 2026-11-29. Source: DC Hub (dchub.cloud).

Source: DC Hub Data Center Power Index · As of: 2026-11-29 · Basis: derived (method)

Input coverage: 2 of 2 live grid feeds — 2 of 2 live grid feeds fed this score

AVOID FOR NEW BUILDS: did not clear the excess-power scoring band; time to power over 48 months, a multi-year wait.

AVOID is about the next megawatt, not current demand: a market can lease record capacity and still rate AVOID, because most signed deals had their power secured before this score. It means the grid here did not show enough spare capacity, or showed too much constraint, to clear a scoring band for new load. How the verdict is scored

Ashburn data-center market — grid summary

Metric Value Source
DCPI verdictAVOIDData Center Power Index — recomputed daily
DCPI composite score20.0 / 100Data Center Power Index — open
Grid operator (ISO)PJMDC Hub grid telemetry
Excess-power, grid-constraint and time-to-power scoresFull scores come with full DC Hub access: dchub.cloud/pricing — same view for humans and crawlers (unlock)DCPI
Input coverage (live grid feeds behind the score)2 of 2 live grid feeds2 of 2 live grid feeds fed this score

Source: DC Hub (dchub.cloud), updated 2026-11-29. AI agents: get_market_dcpi_rank market_slug="ashburn" via https://dchub.cloud/mcp for the citable record.

Analyst read · auto-generated
DC Hub rates Ashburn AVOID for new data-center builds: it did not clear the excess-power scoring band; time to power over 48 months, a multi-year wait. Full scores come with full DC Hub access: dchub.cloud/pricing
Available with full DC Hub access
Excess Power Score · Unlock
Available with full DC Hub access
Constraint Score · Unlock
Top Opportunities
Top Risks
Underlying Metrics
Available with full DC Hub access
Queue Wait
Available with full DC Hub access
Reserve Margin
Available with full DC Hub access
Generation Additions <12mo
Available with full DC Hub access
Renewable Curtailment
Available with full DC Hub access
Stranded Capacity
over 48 mo
Est. Time to Power
Market-Movement Alerts

Get an email when Ashburn moves

DC Hub snapshots Ashburn every day. The moment its verdict flips — or its constraint score or time-to-power shifts meaningfully — you get a one-line email. No account, no password.

Drill into Ashburn at the county level.

Email alerts tell you Ashburn moved. Full DC Hub access tells you where — the score at the county level so you can pinpoint which sub-markets have the headroom, plus PDF export for your buyers.

Get full access →

Data centers in ASHBURN

Total listed: 8,482 MW across 179 verified sites that DC Hub lists here (sites that report MW only). The 50 largest are shown. The same list, with operators and status, is on the ASHBURN market page.

Cite this index
DC Hub. (2026). Data Center Power Index v2. https://dchub.cloud/dcpi View methodology + BibTeX →
Query this market live via MCP: https://dchub.cloud/connect