The State of Data Center Power

The recurring, machine-readable answer to the only question that matters for an AI build: where can you actually get power, and where can't you? 182 markets scored daily by the Data Center Power Index across 7 live US ISOs and 3 international grids. Free, citable, and the only data-center-intelligence source an LLM can both query and cite.

21,000+Facilities tracked
233Markets
126,427Substations
7+3Live ISOs (US + intl)
8 BUILD 100 CAUTION 74 AVOID 182 markets scored

Where to BUILD

Highest composite DCPI scores — most buildable headroom, lowest grid constraint. How this is scored →

MarketISOCompositeExcess PowerConstraint
MontréalHQ70.065.225.6
La VistaSPP62.758.232.7
LenexaSPP62.758.232.7
Oklahoma CitySPP62.758.232.7
OmahaSPP62.758.232.7
Overland ParkSPP62.758.232.7
PapillionSPP62.758.232.7
TulsaSPP62.758.232.7

Where to AVOID

Most grid-constrained markets — long interconnection waits, congested transmission.

MarketISOConstraint score
DublinPJM72.5
LondonNGESO71.8
AmsterdamENTSOE-NL70.0
FrankfurtENTSOE-DE66.8
ManchesterISONE66.0
PhoenixWECC61.5
SydneyAEMO61.2
TokyoTEPCO60.5
SingaporeEMA59.2
ChicagoPJM56.0

Live grids

7 live US ISOs with real-time grid data:

ERCOTTexas CAISOCalifornia NYISONew York MISOMidwest / Gulf PJMMid-Atlantic / Ohio Valley SPPCentral Plains ISO-NENew England

3 international markets:

Hydro-QuébecQuébec, Canada AESOAlberta, Canada Nord PoolNordics + Baltics

Real-time fuel mix — PJM Interconnection live

A live sample of what's actually generating on the grid that hosts the largest data-center interconnection queue. Live from grid_data.

FuelOutputShare
Natural gas40,669 MWh42%
Nuclear31,053 MWh32%
Coal16,767 MWh17%
Hydro3,248 MWh3%
Other2,743 MWh3%
Wind2,376 MWh2%
Oil230 MWh0%
Solar10 MWh0%

Source: PJM real-time generation by fuel (EIA-930 v2, grid_data)

Interconnection-queue depth

Live data-center load in each ISO's interconnection queue — the leading indicator of where power demand is piling up.

ISOTotal queued (GW)DC load (GW)DC share
ERCOT
ERCOT MIS
410.0357.087.0%
CAISO
CAISO Cluster Study
165.028.017.0%
SPP
SPP Generator Interconnection
95.018.018.9%
MISO
MISO Generator Interconnection Queue
78.021.026.9%
NYISO
NYISO Queue
38.08.522.4%
PJM
PJM Queue Tracker
30.022.073.3%
ISO-NE
ISO-NE Interconnection Process
22.04.118.6%

The full physical stack — in one query

The full physical stack for a site — power + fiber + substations + gas pipelines + water risk + interconnection queues + tax incentives — in one query.

Why this exists

DC Hub is the only data-center-intelligence source an LLM can both QUERY (28 MCP tools) and CITE (CC-BY-4.0, stable URLs, JSON-LD). Competing sources are paywalled, login-gated, or block AI crawlers — none are agent-readable.

Cite this

Permanent URL: https://dchub.cloud/state-of-power · Methodology: https://dchub.cloud/state-of-power/methodology DC Hub. (2026). The State of Data Center Power. https://dchub.cloud/state-of-power (accessed 2026-05-30). Methodology: https://dchub.cloud/state-of-power/methodology. Licensed CC-BY-4.0.