Live · as of 2026-11-25
Monthly trend snapshot

July 2025 in data centers.

A live monthly readout of the global data center market: facilities discovered, capacity changed hands, deal volume, AI-agent queries, and per-market trends. Every number is pulled from DC Hub's live ingest pipeline — no spreadsheet versioning, no quarterly lag.

July 2025 in one paragraph · as of 2026-11-25

DC Hub's Data Center Power Index (DCPI) scores 334 data-center markets on power availability: 28 BUILD, 104 CAUTION and 202 AVOID. 141 data-center deals were auto-extracted from news in July 2025; DC Hub has verified none of them yet, so their buyers, sellers and values are unconfirmed. The facility count and total MW are withheld until source records are deduplicated.

Cite as: DC Hub (dchub.cloud), as of 2026-11-25. https://dchub.cloud/reports/monthly/2025-07

Executive summary · auto-generated · claude-haiku-4-5-20251001 · 2026-11-25

July 2025 logged 141 deals representing 4,141.5 MW of capacity activity—a 6,950% month-over-month jump from June's 2 deals and a 2,720% year-over-year surge. All 141 deals remain unverified at present, reflecting rapid pipeline velocity and emerging deal flow that has not yet closed to public confirmation. Geographically, activity concentrated in power-constrained rural and secondary markets: Richland Parish, Louisiana led with 5,000 MW across 9 facilities, followed by Las Cruces, New Mexico at 4,500 MW (single facility), and Ashburn, Virginia at 4,296 MW across 160 properties. Texas nodes—Abilene (2,950 MW, 4 facilities) and Sweetwater (2,200 MW, 4 facilities)—captured significant secondary positioning. The distribution signals hyperscaler rotation away from saturated coastal metros toward underutilized grid capacity in MISO, SPP, and ERCOT footprints where power availability and land economics remain favorable.

This surge portends sustained competition for utility-scale power across Q3 and Q4 2025. The concentration of capacity in single or low-facility counts in Richland Parish and Las Cruces suggests either very large per-facility commitments or a cluster of smaller greenfield starts by multiple players chasing the same resource nodes. With unverified deal velocity at this level, expect a 60–90-day lag before closed confirmations reach announced capex; however, the sheer MW volume logged implies real pre-lease activity or signed LOIs, not speculative inquiry. Hyperscalers should anticipate tightening utility interconnection queues in these markets within two quarters and rising land/power costs as capital herds into the same sweet spots. Real-estate and power investors tracking secondary-market basis should monitor Richland and Las Cruces demand confirmation closely—these two markets alone now command strategic infrastructure attention.

01Headline

— Facilities
Global facility map
— Power tracked
Withheld · source records not yet deduplicated
0 New this month
facility records discovered · batch ingest, not a market trend
$298.4B Deal $ (July 2025)
141 deals (141 unverified) · 70.5× MoM

02What changed this month

0 Facility records discovered
vs 0 prior month · discovery runs in batches, so the change is not a market trend
70.5× Deal count
141 deals (July 2025) · vs 2 prior month
— AI agent queries
0 calls this month · Claude and Cursor

03M&A · Trailing 30 days

DateBuyerSellerValueMW
2026-11-05Microsoftunverified?$35.0B—
2026-10-29Googleunverified?$25.0B—
2026-10-29Microsoftunverified?$25.0B—
2026-11-03Metaunverified?$20.0B—
2026-11-06Googleunverified?$17.0B—

Rows marked unverified were auto-extracted from news headlines and have not been checked by DC Hub; buyer, seller and value may be wrong.

04Top markets by operating MW

MarketFacilitiesOperating MW
Richland Parish95,000
Las Cruces14,500
Ashburn1604,296
Abilene42,950
Sweetwater42,200
Lebanon72,002
Memphis82,000
Mason County12,000
West Texas12,000
Dallas801,726

05Power Index movers

MarketDCPI ScoreΔ Week
Power Index movers are on the DC Hub plan with every tool: they are chosen by the size of the 7-day move in the paid excess-power score.

06Construction pipeline

MarketProjectsPipeline MW
CA6234,604
Texas3928,382
India1811,895
Paducah, Kentucky49,600
VA128,834
AZ238,534
New Mexico58,300
Pennsylvania47,775
IL117,743
Ohio67,150

Not shown: 246 pipeline projects (170,230 MW) with no market recorded.

07Press kit · for journalist use

These sentences are free for journalists, analysts, and partners to use with attribution to DC Hub. Numbers are live as of 2026-11-25.

"In July 2025, DC Hub tracked 141 M&A transactions worth $298.4B in aggregate disclosed value."— DC Hub · https://dchub.cloud/reports/monthly/2025-07
"Of the 141 transactions tracked in July 2025, 141 were auto-extracted from news headlines and have not yet been verified."— DC Hub · https://dchub.cloud/reports/monthly/2025-07
"4,142 MW of capacity changed hands through M&A and JV transactions tracked by DC Hub in July 2025."— DC Hub · https://dchub.cloud/reports/monthly/2025-07

08About this report

This snapshot is regenerated every time the page is loaded — no quarterly lag, no spreadsheet versioning. Historical months are immutable: /reports/monthly/2026-04 always shows April 2026's numbers as snapshotted when April closed. Same data is also available via:

DC Hub · neutral data layer for data center infrastructure · July 2025 trend snapshot
dchub.cloud · cited by · partnerships · API docs
CC-BY-4.0 Open data, free to cite. Licensed under Creative Commons Attribution 4.0 International. Use in your research, press, or investor deck — attribution required, no fee, no NDA, no embargo.
Cite as: DC Hub. (2026). Monthly Data Center Trend Report. https://dchub.cloud/reports/monthly. Licensed CC-BY-4.0.