June 2025 in one paragraph · as of 2026-11-25

DC Hub's Data Center Power Index (DCPI) scores 334 data-center markets on power availability: 28 BUILD, 104 CAUTION and 202 AVOID. DC Hub tracked 2 data-center deals in June 2025, 2 of them verified ($28.6B verified value). The facility count and total MW are withheld until source records are deduplicated.

Cite as: DC Hub (dchub.cloud), as of 2026-11-25. https://dchub.cloud/reports/monthly/2025-06

Executive summary · auto-generated · claude-haiku-4-5-20251001 · 2026-11-25

Capital formation in June 2025 logged two transactions totaling $28.6 billion across 2,300 MW, anchored by Blue Owl Capital's $27 billion acquisition of Meta Louisiana DC assets on June 1st. This single deal underscores the structural repricing of AI-era data center portfolios: a mature operator with committed power and existing grid interconnection commanded a valuation that reflects both the scarcity of brownfield capacity in power-constrained regions and the depth of institutional capital willing to pay for de-risked, operational megawatt. The secondary transaction—GIC and ADIA's $1.6 billion co-investment in Vantage APAC—signals continued appetite from Asia-Pacific sovereign wealth for geographically diversified AI infrastructure. June's deal count fell 60% year-over-year, but the per-MW and per-deal dollar intensity suggests consolidation in the M&A market is screening hard for assets with existing power contracts and minimal permitting tail risk.

This month's activity points to a two-quarter window in which power availability, not capital, becomes the binding constraint on capacity expansion. Richland Parish (5,000 MW across 9 facilities), Las Cruces (4,500 MW in a single facility), and Ashburn (4,296 MW across 160 properties) remain the pole stars for hyperscaler land grabs, but each operates under distinct grid pressure: Louisiana faces transmission congestion; New Mexico benefits from utility-backed renewable buildout but lacks nearby fiber; Northern Virginia confronts peak-hour demand saturation. Expect M&A to migrate toward platforms with pre-signed renewable PPAs and existing transmission slots through Q3 2025. Deals logged will likely remain thin, but dollar-per-MW will stay elevated as buyers compete for optionality on power, not space.

01Headline

— Facilities
Global facility map
— Power tracked
Withheld · source records not yet deduplicated
0 New this month
facility records discovered · batch ingest, not a market trend
$28.6B Deal $ (June 2025)
2 deals · — MoM

02What changed this month

0 Facility records discovered
vs 0 prior month · discovery runs in batches, so the change is not a market trend
— Deal count
2 deals (June 2025) · vs 0 prior month
— AI agent queries
0 calls this month · Claude and Cursor

03M&A · Calendar month

DateBuyerSellerValueMW
2025-06-01Blue Owl CapitalMeta Louisiana DC$27.0B2,000
2025-06-01GIC/ADIAVantage APAC$1.6B300

04Top markets by operating MW

MarketFacilitiesOperating MW
Richland Parish95,000
Las Cruces14,500
Ashburn1604,296
Abilene42,950
Sweetwater42,200
Lebanon72,002
Memphis82,000
Mason County12,000
West Texas12,000
Dallas801,726

05Power Index movers

MarketDCPI ScoreΔ Week
Power Index movers are on the DC Hub plan with every tool: they are chosen by the size of the 7-day move in the paid excess-power score.

06Construction pipeline

MarketProjectsPipeline MW
CA6234,604
Texas3928,382
India1811,895
Paducah, Kentucky49,600
VA128,834
AZ238,534
New Mexico58,300
Pennsylvania47,775
IL117,743
Ohio67,150

Not shown: 246 pipeline projects (170,230 MW) with no market recorded.

07Press kit · for journalist use

These sentences are free for journalists, analysts, and partners to use with attribution to DC Hub. Numbers are live as of 2026-11-25.

"In June 2025, DC Hub tracked 2 M&A transactions worth $28.6B in aggregate disclosed value."— DC Hub · https://dchub.cloud/reports/monthly/2025-06
"2,300 MW of capacity changed hands through M&A and JV transactions tracked by DC Hub in June 2025."— DC Hub · https://dchub.cloud/reports/monthly/2025-06

08About this report

This snapshot is regenerated every time the page is loaded — no quarterly lag, no spreadsheet versioning. Historical months are immutable: /reports/monthly/2026-04 always shows April 2026's numbers as snapshotted when April closed. Same data is also available via:

DC Hub · neutral data layer for data center infrastructure · June 2025 trend snapshot
dchub.cloud · cited by · partnerships · API docs
CC-BY-4.0 Open data, free to cite. Licensed under Creative Commons Attribution 4.0 International. Use in your research, press, or investor deck — attribution required, no fee, no NDA, no embargo.
Cite as: DC Hub. (2026). Monthly Data Center Trend Report. https://dchub.cloud/reports/monthly. Licensed CC-BY-4.0.
📩 Get the monthly report by email
Fresh DC Hub data-center intelligence in your inbox. No spam — unsubscribe anytime.
⬇ Download the full dataset— enter your email above first