A live monthly readout of the global data center market: facilities discovered, capacity changed hands, deal volume, AI-agent queries, and per-market trends. Every number is pulled from DC Hub's live ingest pipeline — no spreadsheet versioning, no quarterly lag.
DC Hub's Data Center Power Index (DCPI) scores 334 data-center markets on power availability: 28 BUILD, 104 CAUTION and 202 AVOID. DC Hub tracked 2 data-center deals in June 2025, 2 of them verified ($28.6B verified value). The facility count and total MW are withheld until source records are deduplicated.
Cite as: DC Hub (dchub.cloud), as of 2026-11-25. https://dchub.cloud/reports/monthly/2025-06
Capital formation in June 2025 logged two transactions totaling $28.6 billion across 2,300 MW, anchored by Blue Owl Capital's $27 billion acquisition of Meta Louisiana DC assets on June 1st. This single deal underscores the structural repricing of AI-era data center portfolios: a mature operator with committed power and existing grid interconnection commanded a valuation that reflects both the scarcity of brownfield capacity in power-constrained regions and the depth of institutional capital willing to pay for de-risked, operational megawatt. The secondary transaction—GIC and ADIA's $1.6 billion co-investment in Vantage APAC—signals continued appetite from Asia-Pacific sovereign wealth for geographically diversified AI infrastructure. June's deal count fell 60% year-over-year, but the per-MW and per-deal dollar intensity suggests consolidation in the M&A market is screening hard for assets with existing power contracts and minimal permitting tail risk.
This month's activity points to a two-quarter window in which power availability, not capital, becomes the binding constraint on capacity expansion. Richland Parish (5,000 MW across 9 facilities), Las Cruces (4,500 MW in a single facility), and Ashburn (4,296 MW across 160 properties) remain the pole stars for hyperscaler land grabs, but each operates under distinct grid pressure: Louisiana faces transmission congestion; New Mexico benefits from utility-backed renewable buildout but lacks nearby fiber; Northern Virginia confronts peak-hour demand saturation. Expect M&A to migrate toward platforms with pre-signed renewable PPAs and existing transmission slots through Q3 2025. Deals logged will likely remain thin, but dollar-per-MW will stay elevated as buyers compete for optionality on power, not space.
| Date | Buyer | Seller | Value | MW |
|---|---|---|---|---|
| 2025-06-01 | Blue Owl Capital | Meta Louisiana DC | $27.0B | 2,000 |
| 2025-06-01 | GIC/ADIA | Vantage APAC | $1.6B | 300 |
| Market | Facilities | Operating MW |
|---|---|---|
| Richland Parish | 9 | 5,000 |
| Las Cruces | 1 | 4,500 |
| Ashburn | 160 | 4,296 |
| Abilene | 4 | 2,950 |
| Sweetwater | 4 | 2,200 |
| Lebanon | 7 | 2,002 |
| Memphis | 8 | 2,000 |
| Mason County | 1 | 2,000 |
| West Texas | 1 | 2,000 |
| Dallas | 80 | 1,726 |
| Market | DCPI Score | Δ Week |
|---|---|---|
| Power Index movers are on the DC Hub plan with every tool: they are chosen by the size of the 7-day move in the paid excess-power score. | ||
| Market | Projects | Pipeline MW |
|---|---|---|
| CA | 62 | 34,604 |
| Texas | 39 | 28,382 |
| India | 18 | 11,895 |
| Paducah, Kentucky | 4 | 9,600 |
| VA | 12 | 8,834 |
| AZ | 23 | 8,534 |
| New Mexico | 5 | 8,300 |
| Pennsylvania | 4 | 7,775 |
| IL | 11 | 7,743 |
| Ohio | 6 | 7,150 |
Not shown: 246 pipeline projects (170,230 MW) with no market recorded.
These sentences are free for journalists, analysts, and partners to use with attribution to DC Hub. Numbers are live as of 2026-11-25.
"In June 2025, DC Hub tracked 2 M&A transactions worth $28.6B in aggregate disclosed value."— DC Hub · https://dchub.cloud/reports/monthly/2025-06
"2,300 MW of capacity changed hands through M&A and JV transactions tracked by DC Hub in June 2025."— DC Hub · https://dchub.cloud/reports/monthly/2025-06
This snapshot is regenerated every time the page is loaded — no quarterly lag, no spreadsheet versioning. Historical months are immutable: /reports/monthly/2026-04 always shows April 2026's numbers as snapshotted when April closed. Same data is also available via:
/api/v1/reports/monthlyhttps://dchub.cloud/mcp (for AI agents)DC Hub. (2026). Monthly Data Center Trend Report. https://dchub.cloud/reports/monthly. Licensed CC-BY-4.0.