A live monthly readout of the global data center market: facilities discovered, capacity changed hands, deal volume, AI-agent queries, and per-market trends. Every number is pulled from DC Hub's live ingest pipeline — no spreadsheet versioning, no quarterly lag.
DC Hub's Data Center Power Index (DCPI) scores 334 data-center markets on power availability: 28 BUILD, 104 CAUTION and 202 AVOID. DC Hub tracked 9 data-center deals in September 2024, 9 of them verified ($54.5B verified value). The facility count and total MW are withheld until source records are deduplicated.
Cite as: DC Hub (dchub.cloud), as of 2026-11-26. https://dchub.cloud/reports/monthly/2024-09
September 2024 logged 9 deals valued at $54.45 billion across 5,165 MW—a 240% month-over-month surge in capital deployment and a doubling of deal volume year-over-year. The headline was capital concentration: three verified transactions accounted for $45.1 billion, led by Blackstone and CPPIB's $16.1 billion acquisition of AirTrunk's portfolio, Microsoft's $16 billion power purchase agreement with Constellation Energy, and Blackstone's $13 billion purchase of UK AI Infrastructure assets. Geography split sharply between infrastructure and power. Richland Parish and Las Cruces dominated the capacity numbers—5,000 MW and 4,500 MW respectively—reflecting the ongoing hyperscaler pivot to rural grid access and power procurement outside legacy colocation hubs, though Ashburn maintained its position as the largest single metro with 4,296 MW across 160 facilities, signaling that Tier-1 coastal markets remain resilient for edge and enterprise workloads.
This month signals a structural shift in how hyperscalers are acquiring capacity. The scale and speed of the AirTrunk, Constellation, and UK AI deals indicate that build-to-suit and greenfield development at scale now trades as portfolio M&A rather than incremental leasing. Expect this pattern to accelerate through Q4 2024 and into 2025: power availability and long-term PPA certainty are now the primary acquisition criteria, subordinating location arbitrage. Markets with constrained grid interconnection queues—even those with ready land and incentives—will face headwinds unless they can credibly shorten utility timelines. Conversely, regions like Richland Parish with demonstrated nuclear or renewable backstop and clear transmission paths should see sustained capital flow. Watch for similar mega-deals targeting European and APAC infrastructure in the next two quarters as the AI capex cycle drives consolidation globally.
| Date | Buyer | Seller | Value | MW |
|---|---|---|---|---|
| 2024-09-25 | Blackstone/CPPIB | AirTrunk | $16.1B | 1,800 |
| 2024-09-20 | Microsoft | Constellation Energy | $16.0B | 835 |
| 2024-09-15 | Blackstone | UK AI Infrastructure | $13.0B | 500 |
| 2024-09-15 | DigitalBridge/Silver Lake | Vantage NA | $6.4B | 1,500 |
| 2024-09-12 | UK Infrastructure | $1.0B | 150 |
| Market | Facilities | Operating MW |
|---|---|---|
| Richland Parish | 9 | 5,000 |
| Las Cruces | 1 | 4,500 |
| Ashburn | 160 | 4,296 |
| Abilene | 4 | 2,950 |
| Sweetwater | 4 | 2,200 |
| Lebanon | 7 | 2,002 |
| Memphis | 8 | 2,000 |
| Mason County | 1 | 2,000 |
| West Texas | 1 | 2,000 |
| Dallas | 80 | 1,726 |
| Market | DCPI Score | Δ Week |
|---|---|---|
| Power Index movers are on the DC Hub plan with every tool: they are chosen by the size of the 7-day move in the paid excess-power score. | ||
| Market | Projects | Pipeline MW |
|---|---|---|
| CA | 62 | 34,604 |
| Texas | 39 | 28,382 |
| India | 18 | 11,895 |
| Paducah, Kentucky | 4 | 9,600 |
| VA | 12 | 8,834 |
| AZ | 23 | 8,534 |
| New Mexico | 5 | 8,300 |
| Pennsylvania | 4 | 7,775 |
| IL | 11 | 7,743 |
| Ohio | 6 | 7,150 |
Not shown: 246 pipeline projects (170,230 MW) with no market recorded.
These sentences are free for journalists, analysts, and partners to use with attribution to DC Hub. Numbers are live as of 2026-11-26.
"September 2024 saw 9 tracked M&A transactions ($54.5B in aggregate disclosed value), a count that increased 50.0% from the prior month."— DC Hub · https://dchub.cloud/reports/monthly/2024-09
"5,165 MW of capacity changed hands through M&A and JV transactions tracked by DC Hub in September 2024."— DC Hub · https://dchub.cloud/reports/monthly/2024-09
This snapshot is regenerated every time the page is loaded — no quarterly lag, no spreadsheet versioning. Historical months are immutable: /reports/monthly/2026-04 always shows April 2026's numbers as snapshotted when April closed. Same data is also available via:
/api/v1/reports/monthlyhttps://dchub.cloud/mcp (for AI agents)DC Hub. (2026). Monthly Data Center Trend Report. https://dchub.cloud/reports/monthly. Licensed CC-BY-4.0.