Perth, WA data center market

Power availability in Perth, WA: DCPI verdict AVOID, composite score 24.1 of 100, as of 2026-11-18. Source: DC Hub.

Data Center Market Deep-Dive · 250 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-18

DCPI Score24.1/100
MW, all listings240sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Colocation lease rates in Perth, WA

DC Hub does not hold a lease-rate figure for this market yet.

The market has recorded no recent deal activity, reflecting a pause in announced capacity expansion or M&A since the last tracking cycle.

The DCPI verdict of AVOID carries a specific diagnostic signal about power supply dynamics. Together these readings suggest that new capacity commitments in Perth will encounter material delays in securing power feed-in, grid connection studies, or interconnection queue positions. This is not a statement about market demand or facility quality; it reflects the technical and commercial landscape for sourcing additional electricity supply.

Operator distribution shows fragmentation typical of maturing regional markets. The absence of recent deal announcements indicates no material M&A or capacity acquisition has been publicly tracked in the current window. This silence does not signal retreat or weakness in underlying demand; it reflects a market pausing between investment cycles.

Data centers in Perth, WA

FacilityOperatorStatusMW
DC WestDC West Pty LtdOperational
Equinix PE2EquinixOperational
NEXTDC P1 PerthNEXTDCOperational
Pier Data CentreDC AllianceOperational
QV.1 PerthCBRE Managing AgentOperational
RackmillRackmill, RackmillOperational
TelstraOperational
Vocus Perth PER01Vocus GroupOperational
aCureVocus GroupOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Australia.

More on Perth, WA

Email me when the Perth, WA DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Perth, WA: 240 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/perth/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load