aCure is a data center operated by Vocus Group in Perth, WAS, AU. The facility is currently operational. It sits in the Perth data-center market on the AEMO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 32.7-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Perth — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Perth — the market this facility sits in (full deep-dive →).
Perth's data center market remains constrained and undersupplied, with 75 tracked facilities totaling 260 MW across a fragmented operator base. The excess-power score of 35/100 signals acute capacity scarcity, while the constraint rating of 52/100 reflects infrastructure bottlenecks that limit expansion velocity. This combination positions Perth as a low-utilization, high-friction market where supply cannot meet near-term demand growth. The DCPI verdict of AVOID is unambiguous for acquisition-stage investors: the market lacks the operational surplus and pricing flexibility that make M&A economically defensible. With only 35 points of excess power available, any inbound capital would compete directly with existing operators for scarce grid capacity and interconnect slots. Buyers entering now would inherit legacy asset bases constrained by the same infrastructure limitations that suppress…
Published DC Hub data for this location.
Networks recorded as present at or immediately around aCure in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Further networks are recorded at this location beyond those listed here.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 22 operating generating units totalling 1,719 MW within about 50 km of Perth, AU. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Perth tracked by DC Hub — compare power, operators, and grid context across the market.