Power availability in New Albany, OH: DCPI verdict AVOID, composite score 17.9 of 100, as of 2026-11-18. Source: DC Hub.
Data Center Market Deep-Dive · 187 words · generated 2026-11-18 from live DC Hub data · DCPI live as of 2026-11-18
New Albany, OH has 100 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-18. By listed capacity the largest operators are STACK Infrastructure (100 MW).
| Status | MW |
|---|---|
| Under construction | 100 |
| Total listed | 100 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| STACK Infrastructure | 100 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-18. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it can be larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
The footprint reflects significant hyperscaler concentration in the region, with no recent deals tracked in the current window.
The DCPI verdict flags New Albany as unsuitable for new power projects under present conditions.
No recent deals are tracked for New Albany. Regional news coverage reflects ongoing tension around power sourcing: public hearings have addressed proposed gas-fired power plants dedicated to data center supply in New Albany, indicating that operator expansion plans depend on localized generation rather than existing grid capacity.
New Albany's power environment remains tight, and operators planning greenfield or significant expansion projects will face material infrastructure bottlenecks absent grid or generation relief.
| Facility | Operator | Status | MW |
|---|---|---|---|
| STACK New Albany OH | STACK Infrastructure | Under Construction | 100 |
| Amazon New Albany: Jug and Beach Road | Operational | ||
| Amazon Web Services CMH50 | Amazon Web Services | Operational | |
| Amazon Web Services CMH53 | Amazon Web Services | Operational | |
| Amazon Web Services CMH62 | Amazon Web Services | Operational | |
| Compugen New Albany | Operational | ||
| Google NBY-1 | Operational | ||
| Google NBY-3 | Operational | ||
| Google NBY-4 | Operational | ||
| Google NBY-5 | Operational | ||
| Google NBY-7 | Operational | ||
| Meta New Albany Data Center | Meta | Operational | |
| Meta New Albany Ohio | Meta | Operational | |
| QTS NAL 2 DC1 | QTS Realty | Operational | |
| QTS NAL 2 DC2 | Quality Technology Services | Operational | |
| QTS NAL1 DC1 | Quality Technology Services | Operational | |
| QTS NAL1 DC2 | QTS Realty | Operational | |
| TJX Corporate Techno | Operational | ||
| Vantage Building 1 | Vantage Data Centers | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Ohio.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
New Albany, OH: 1,815 MW tracked, any status — live, cited, and queryable by API or MCP.
No requirements registered yet.
Counts from the weekly Capacity Pulse. A market and size band is shown only when at least 3 different parties are behind it.
JSON: /api/v1/markets/new-albany/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-18, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load