Yondr Allegro North Campus (Loudoun County) is a data center operated by Yondr Group in Ashburn, VA, US. It carries a reported power capacity of 48.0 MW and is currently under construction.
In the Ashburn market on the PJM grid, Yondr Allegro North Campus (Loudoun County)’s 48 MW is under 1% of the 8,662 MW DC Hub’s brief counts there. The closest tracked facility is Digital Realty ACC7, under 1 km away, and the nearest mapped substation is within 1 km. Read the Ashburn market brief →
Published DC Hub data for this location.
Networks recorded as present at or immediately around Yondr Allegro North Campus (Loudoun County) in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Further networks are recorded at this location beyond those listed here.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 71 operating generating units totalling 1,611 MW within about 50 km of Ashburn, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.