STACK Stafford Technology Campus is a data center operated by STACK Infrastructure in Stafford, VA, US. It carries a reported power capacity of 1000.0 MW and is currently under construction. It sits in the Culpeper data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 31.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Culpeper — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Culpeper — the market this facility sits in (full deep-dive →).
Culpeper hosts seven tracked facilities totaling 216 MW, dominated by Equinix's four-facility footprint across multiple operators. The market shows fragmentation typical of secondary Virginia markets, with EdgeCore Digital Infrastructure and EQUINIX, LLC - CU 1-4 holding minority positions. This distributed operational structure contrasts with consolidated markets where single operators control 60%+ of capacity, suggesting limited economies of scale and coordination potential for new entrants. The DCPI verdict of AVOID, driven by an excess-power score of 46/100 paired with a constraint score of 41/100, signals fundamental infrastructure misalignment. An excess-power rating below 50 indicates insufficient power headroom for incremental workload absorption—critical for hyperscaler and AI-driven expansion. The constraint score of 41 reinforces this concern, suggesting grid infrastructure…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in Stafford tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="stack-infrastructure-stack-stafford-technology-campus-9829f0c1" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect