EdgeCore Louisa County Campus is a data center operated by EdgeCore Digital Infrastructure in Louisa, VA, US. Its reported power capacity falls in the 1–5 GW range and it is currently planned.
Source: DC Hub facilities registry · Added , not re-checked since · Basis: cited (what this means)
EdgeCore Louisa County Campus is one of 6 facilities DC Hub’s Culpeper brief counts on the PJM grid. The closest tracked facility is AMAZON DATA SERVICES INC., IAD 550 LOUISA REB, about 17 km away, and the nearest mapped substation is within 5 km. Read the Culpeper market brief →
Published DC Hub data for this location.
DC Hub tracks 36 operating generating units totalling 7,584 MW within about 50 km of Louisa, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Nearest first, by distance from this site.
execute_plan with this page's question for one dated, cited answer.
You can also query get_facility slug="edgecore-digital-infrastructure-edgecore-louisa-county-campus-b3e01898".
Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect:
https://dchub.cloud/connect