Compass Datacenters Prince William County VA is a data center operated by Compass Datacenters in Bristow, VA, US. It carries a reported power capacity of 300.0 MW and is currently under construction. It sits in the Bristow data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 20.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Bristow — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Bristow — the market this facility sits in (full deep-dive →).
Bristow's data center footprint remains modest, with five tracked facilities totaling 374 MW across a fragmented operator base. The market is dominated by hyperscale and regional players: Microsoft operates the largest single asset MNZ03—Gainesville, while Compass Datacenters, Digital Realty, and Yondr Group each control one facility. This operational fragmentation, combined with the absence of recent M&A activity, suggests limited consolidation momentum and indicates a market in equilibrium rather than expansion phase. The DCPI verdict of AVOID is rooted in a critical structural imbalance: an excess-power score of 46/100 paired with a constraint score of 56/100 signals that while power capacity exists, infrastructure constraints—likely cooling, land availability, or interconnection bottlenecks—significantly limit buildout potential. For acquisition-focused investors, this combination…
Published DC Hub data for this location.
Comparable facilities in Bristow tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="compass-datacenters-compass-datacenters-prince-william-county-va-da26c259" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=compass-datacenters-compass-datacenters-prince-william-county-va-da26c259