Soluna - Project Kati Expansion is a data center operated by Soluna Holdings in TX, US. It carries a reported power capacity of 100.0 MW and is currently planned. It sits in the Midlothian data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 32.0-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for Midlothian — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Midlothian — the market this facility sits in (full deep-dive →).
Midlothian hosts three operational facilities totaling 425 MW, establishing a modest but growing computational footprint in the region. Google dominates the operator landscape with all three tracked facilities under its control, concentrating both capacity and strategic direction. The market has registered no recent M&A activity, suggesting either stability among existing owners or limited secondary market liquidity. This narrow operator base contrasts with larger competitive markets where multiple players drive price discovery and alternative expansion pathways. The DCPI verdict of BUILD, driven by an excess-power score of 65/100 paired with a moderate constraint rating of 43/100, signals genuine development opportunity. The high excess-power metric indicates regional grid availability and utility willingness to absorb new load—essential for colocation and hyperscaler operations. The…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in TX tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="soluna-holdings-soluna-project-kati-expansion-fb126cd7" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect