CoreWeave West Texas (Project Horizon)

CoreWeave West Texas (Project Horizon) is a data center operated by CoreWeave in West Texas, TX, US. It carries a reported power capacity of 2000.0 MW and is currently planned. It sits in the West Texas data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 32.0-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Power
2000.0 MW
Status
Planned
Market
West Texas
State
TX
Country
US

Market intelligence

CAUTION

Data Center Power Index verdict for West Texas — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on West Texas — the market this facility sits in (full deep-dive →).

West Texas operates 3,950 MW across nine tracked facilities, positioning it as a material regional hub despite fragmented ownership and constraint headwinds. The market is dominated by undisclosed operators controlling four facilities, while Lancium operates two sites and CoreWeave, Galaxy, and IONIC Digital each hold single assets. This distribution reflects early-stage consolidation typical of emerging power-constrained regions. Cardinal Data Power's $20 million raise signals operator confidence in campus-scale expansion, yet the identity of acquirers in three recent Microsoft deals and the Google transaction remains opaque—a pattern suggesting either confidential strategic positioning or incomplete market transparency. The DCPI verdict warrants serious caution: an excess-power score of 61/100 paired with constraint at 43/100 indicates structural power availability is adequate, but…

Location

Area West Texas, TX, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketWest Texas
Grid operatorERCOT
Data Center Power IndexCAUTION
Est. time to power32.0 months
LocationWest Texas, US
Reported capacity2000.0 MW
Nearest substationwithin 5 km

Fiber connectivity

Networks recorded as present at or immediately around CoreWeave West Texas (Project Horizon) in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

CoreWeave

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 3 operating generating units totalling 559 MW within about 50 km of West Texas, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Utility-Scale Solar559 MW · 3 units · 100%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in West Texas tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="coreweave-coreweave-west-texas-project-horizon-6091c279" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind