CoreWeave West Texas (Project Horizon)

CoreWeave West Texas (Project Horizon) is a data center operated by CoreWeave in West Texas, TX, US. It carries a reported power capacity of 2000.0 MW and is currently planned.

Power
2000.0 MW
Status
Planned
Market
West Texas
State
TX
Country
US

Source: DC Hub facilities registry · As of: · Basis: cited (what this means)

Market intelligence

CAUTION

West Texas

Full DCPI breakdown →

Market context

In the West Texas market on the ERCOT grid, CoreWeave West Texas (Project Horizon)’s 2,000 MW is about 51% of the 3,950 MW DC Hub’s brief counts there. The closest tracked facility is Galaxy Helios Data Center Campus, under 1 km away, and the nearest mapped substation is within 5 km. Read the West Texas market brief →

Location

Area West Texas, TX, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationWest Texas, US
Reported capacity2000.0 MW
Nearest substationwithin 5 km

Fiber connectivity

Networks recorded as present at or immediately around CoreWeave West Texas (Project Horizon) in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

CoreWeave

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 3 operating generating units totalling 559 MW within about 50 km of West Texas, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Utility-Scale Solar559 MW · 3 units · 100%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="coreweave-coreweave-west-texas-project-horizon-6091c279" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind