SecureData 365 is a data center in Canton, OH, US. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the Canton data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 15.3-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Canton — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Canton — the market this facility sits in (full deep-dive →).
Canton's data center footprint consists of five tracked facilities totaling 1,009 MW, concentrated among five operators with AWS holding the largest presence at two sites. The market exhibits a structural imbalance: excess power capacity scores 39/100 while infrastructure constraints score 40/100, creating a bifurcated risk profile. This dual weakness—neither surplus power availability nor constrained scarcity—signals a market caught between underutilization and infrastructural bottlenecks that limit expansion economics. For acquisition-focused investors, the DCPI verdict of AVOID reflects a risk-reward asymmetry that penalizes entry. A constraint score of 40/100 indicates meaningful friction in land acquisition, utility interconnection, and cooling deployment—not severe enough to command premium valuations but sufficient to delay project timelines and inflate capex. The excess-power…
Published DC Hub data for this location.
Comparable facilities in Canton tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="securedata-365-securedata-365-267f8075" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=securedata-365-securedata-365-267f8075