ark data centers - Canton,OH is a data center operated by ark data centers in Canton, OH, US. The facility is currently operational. It sits in the Canton data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 25.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Canton — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Canton — the market this facility sits in (full deep-dive →).
Canton's data center market is severely undersupplied and operationally constrained. The five tracked facilities totaling 1,000 MW are distributed across five operators, with Amazon Web Services commanding the largest footprint at two facilities. The excess-power score of 39/100 indicates acute scarcity of available capacity, while the constraint rating of 35/100 signals that existing infrastructure faces material operational limitations—likely tied to aging grid interconnection, limited fiber availability, or cooling/water constraints typical of Ohio industrial markets. The AVOID verdict is unambiguous for acquisition-stage investors. A combined excess-power and constraint score below 40/100 each disqualifies Canton from near-term deployment capital allocation. Unlike legacy asset plays in Washington, DC—where constrained markets can occasionally support margin arbitrage on older…
Published DC Hub data for this location.
Networks recorded as present at or immediately around ark data centers - Canton,OH in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 9 operating generating units totalling 1,814 MW within about 50 km of Canton, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Canton tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="ark-data-centers-ark-data-centers-cantonoh-1abb70e0" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: