Google Henderson Building 3 is a data center operated by Google in Henderson, NV, US. It carries a reported power capacity of 66.0 MW and is currently under construction. It sits in the Henderson data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 10.5-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Henderson — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Henderson — the market this facility sits in (full deep-dive →).
Henderson's data center market remains shallow but tightly controlled, with 266 MW across 4 tracked facilities dominated entirely by Google's 4-facility footprint. The excess-power score of 54/100 indicates moderately constrained supply relative to demand, while the constraint rating of 34/100 reflects significant grid infrastructure limitations. This combination creates an asymmetric risk profile: adequate nameplate capacity paired with operational bottlenecks that could prevent efficient utilization during peak demand scenarios. For acquisition-focused investors, the CAUTION verdict signals neither outright rejection nor clear opportunity. The excess-power rating above 50 suggests Henderson is not yet a distressed market like peers scoring in the 40s, but the constraint score—well below the 50-point equilibrium—introduces material friction costs. Buyers evaluating entry should model…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in Henderson tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="google-google-henderson-building-3-86d6cd6f" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect