Google Henderson Building 3 is a data center operated by Google in Henderson, NV, US. It carries a reported power capacity of 66.0 MW and is currently under construction. It sits in the Henderson data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 10.5-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Henderson — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Henderson — the market this facility sits in (full deep-dive →).
Henderson's data center market is tightening as four tracked facilities totaling 266 MW operate under mounting pressure. Google's dominant footprint—operating all four tracked facilities in the market—concentrates both capacity and strategic control. The DCPI scoring paints a bifurcated picture: excess-power rated at 54/100 signals moderate availability, but the constraint score of 36/100 suggests emerging friction points in land, interconnection, or cooling infrastructure that limit rapid expansion. The CAUTION verdict reflects a market at an inflection point. For acquisition-focused investors, the 54/100 excess-power rating offers breathing room compared to severely constrained peers, but the 36/100 constraint score is the operative warning. This disparity indicates that power may nominally exist, but physical or regulatory barriers prevent efficient deployment—a pattern visible in…
Published DC Hub data for this location.
Comparable facilities in Henderson tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="google-google-henderson-building-3-86d6cd6f" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=google-google-henderson-building-3-86d6cd6f