Google Cloud us-west4 Las Vegas

Google Cloud us-west4 Las Vegas is a data center operated by Google in Henderson, NV, US. The facility is currently operational. It sits in the Henderson data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 10.5-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
Market
Henderson
State
NV
Country
US

Market intelligence

CAUTION

Data Center Power Index verdict for Henderson — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Henderson — the market this facility sits in (full deep-dive →).

Henderson's data center market remains shallow but tightly controlled, with 266 MW across 4 tracked facilities dominated entirely by Google's 4-facility footprint. The excess-power score of 54/100 indicates moderately constrained supply relative to demand, while the constraint rating of 34/100 reflects significant grid infrastructure limitations. This combination creates an asymmetric risk profile: adequate nameplate capacity paired with operational bottlenecks that could prevent efficient utilization during peak demand scenarios. For acquisition-focused investors, the CAUTION verdict signals neither outright rejection nor clear opportunity. The excess-power rating above 50 suggests Henderson is not yet a distressed market like peers scoring in the 40s, but the constraint score—well below the 50-point equilibrium—introduces material friction costs. Buyers evaluating entry should model…

Location

Area Henderson, NV, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketHenderson
Grid operatorWECC
Data Center Power IndexCAUTION
Est. time to power10.5 months
LocationHenderson, US
Nearest substationwithin 1 km

Fiber connectivity

Networks recorded as present at or immediately around Google Cloud us-west4 Las Vegas in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Google LLC

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 107 operating generating units totalling 13,293 MW within about 50 km of Henderson, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas7,180 MW · 32 units · 54%
Utility-Scale Solar3,679 MW · 72 units · 28%
Hydropower2,080 MW · 1 unit · 16%
Wind350 MW · 1 unit · 3%
Geothermal4 MW · 1 unit · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Henderson tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="google-google-cloud-us-west4-las-vegas-cb233771" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind