Equinix LD4 is a data center operated by Equinix in London, GB. It carries a reported power capacity of 28.0 MW and is currently operational. It sits in the London data-center market on the NGESO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 201.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for London — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on London — the market this facility sits in (full deep-dive →).
London's data center market comprises 134 tracked facilities with 647 MW of operational capacity, yet faces a critical supply-demand imbalance that should trigger immediate caution. The market's DCPI score reveals an excess-power rating of 13/100—indicating severe undersupply—paired with a constraint score of 71/100, reflecting substantial infrastructure limitations. This combination signals a market where available power is scarce and grid connectivity is heavily strained, creating a structural ceiling on growth and utilization rates. For acquisition-focused investors, the AVOID verdict is unambiguous and data-driven. With excess power at just 13/100, new entrants face a binary problem: either secure rare incremental capacity at premium rates, or operate existing facilities below nameplate efficiency due to grid constraints. The 71/100 constraint score means that even deployed power…
Comparable facilities in London tracked by DC Hub — compare power, operators, and grid context across the market.