Advanced Communications Technology ACT Wheatland

ACT Wheatland is a data center operated by Advanced Communications Technology in Wheatland, WY, US. The facility is currently operational. It sits in the Cheyenne, WY data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 10.8-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.

Status
Operational
Market
Wheatland
State
WY
Country
US

Market intelligence

BUILD

Data Center Power Index verdict for Cheyenne, WY — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Cheyenne, WY — the market this facility sits in (full deep-dive →).

Cheyenne is consolidating as a high-capacity regional hub with acute power availability but minimal infrastructure constraint. The market spans 42 tracked facilities delivering 2,140 MW across a fragmented operator base, with no single player commanding dominant control. The top operator holds 10 facilities, matched by an equally-sized unknown entity, while Microsoft operates 6 sites and specialized players like the University Corporation for Atmospheric Research 2 facilities maintain niche presences. The absence of recent M&A activity—despite the market's scale—suggests a phase of organic growth rather than competitive consolidation. The DCPI verdict of BUILD excess-power 73/100, constraint 25/100 signals a market with structural tailwinds for greenfield development but without the supply-side friction that typically justifies premium acquisition multiples. The high excess-power score…

Location

Area Wheatland, WY, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketCheyenne, WY
Grid operatorWECC
Data Center Power IndexBUILD
Est. time to power10.8 months
LocationWheatland, US
Nearest substationwithin 1 km

Fiber connectivity

Networks recorded as present at or immediately around ACT Wheatland in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Advanced Communications Technology

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 4 operating generating units totalling 1,748 MW within about 50 km of Wheatland, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal1,710 MW · 3 units · 98%
Hydropower38 MW · 1 unit · 2%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Wheatland tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="advanced-communications-technology-act-wheatland-66ca1075" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind