Crusoe/Tallgrass AI Data Center Campus is a data center operated by Crusoe Energy in Cheyenne, WY, US. It carries a reported power capacity of 1800.0 MW and is currently announced.
In the Cheyenne market on the WECC grid, Crusoe/Tallgrass AI Data Center Campus’s 1,800 MW is about 84% of the 2,140 MW DC Hub’s brief counts there. The closest tracked facility is Azure West Central US Wyoming, under 1 km away, and the nearest mapped substation is within 5 km. Read the Cheyenne market brief →
Published DC Hub data for this location.
Networks recorded as present at or immediately around Crusoe/Tallgrass AI Data Center Campus in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 15 operating generating units totalling 1,584 MW within about 50 km of Cheyenne, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Nearest first, by distance from this site.
get_facility slug="crusoe-energy-crusoetallgrass-ai-data-center-campus-311e7ee3" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect