Novva Cheyenne is a data center operated by Novva Data Centers in Cheyenne, WY, US. It carries a reported power capacity of 40.0 MW and is currently operational. It sits in the Cheyenne data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 10.8-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for Cheyenne — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Cheyenne — the market this facility sits in (full deep-dive →).
Cheyenne is consolidating as a high-capacity regional hub with acute power availability but minimal infrastructure constraint. The market spans 42 tracked facilities delivering 2,140 MW across a fragmented operator base, with no single player commanding dominant control. The top operator holds 10 facilities, matched by an equally-sized unknown entity, while Microsoft operates 6 sites and specialized players like the University Corporation for Atmospheric Research 2 facilities maintain niche presences. The absence of recent M&A activity—despite the market's scale—suggests a phase of organic growth rather than competitive consolidation. The DCPI verdict of BUILD excess-power 73/100, constraint 25/100 signals a market with structural tailwinds for greenfield development but without the supply-side friction that typically justifies premium acquisition multiples. The high excess-power score…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in Cheyenne tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="novva-data-centers-novva-cheyenne-5bb1f377" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect