The Data Center Power Index ranks markets on two daily-refreshing scores: Excess Power (capacity available to absorb new load) and Grid Constraint (impediments to new builds). Two scores set the verdict. Modeled time to power adds 10% to the ranking.
Machine-readable source of truth:
GET /api/v1/dcpi/methodology —
public, no key required. Every figure on this page is rendered from that response.