The Data Center Power Index ranks markets on two daily-refreshing scores: Excess Power (capacity available to absorb new load) and Grid Constraint (impediments to new builds). Two scores set the verdict. Modeled time to power adds 10% to the ranking.
Each market's composite score is: excess*0.60 + (100-constraint)*0.30 + (1 - min(ttp,60)/60)*100*0.10, then multiplied by the verdict quality multiplier
| Input | Weight |
|---|---|
| Excess Power score | 60% |
| Inverse Grid Constraint (100 − constraint) | 30% |
| Modeled time to power | 10% |
Time to power is capped at 60 months in the formula. The verdict multiplies the composite:
| Verdict | Multiplier |
|---|---|
| BUILD | × 1 |
| CAUTION | × 0.85 |
| AVOID | × 0.6 |
| LOW_SIGNAL | × 0.35 |
The first row whose both conditions hold wins; anything else is AVOID.
| Verdict | Excess Power | Grid Constraint |
|---|---|---|
| BUILD | excess ≥ 65 | constraint ≤ 50 |
| CAUTION | excess ≥ 50 | constraint ≤ 70 |
Refresh: approximately 4x/day. The as_of (computed_at) on each market row is the authoritative freshness stamp, not the cron time.
Snapshot of GET /api/v1/dcpi/methodology, baked 2026-11-04. Scoring unchanged since 2026-10-24. The input weights inside the Excess Power and Grid Constraint scores are not in the keyless payload, so they are not shown here.
Machine-readable source of truth:
GET /api/v1/dcpi/methodology —
public, no key required. Every figure on this page is rendered from that response.