How large is the SPP interconnection queue?
SPP's generation interconnection queue is 186 GW as of Nov 23, 2026, as published by the ISO. The typical time to power is about 24 months (ISO-level).
| Grid operator | SPP |
|---|---|
| Generation queue | 186 GW |
| Typical time to power | about 24 months (ISO-level) |
Source: SPP GI active requests (MAX Summer MW, excl. cessation), published Nov 23, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.
Cite as: DC Hub (dchub.cloud), "How large is the SPP interconnection queue?", https://dchub.cloud/ai-answers/spp-interconnection-queue, as of Nov 23, 2026.
The figures and their dates
As of Nov 23, 2026, the figures on this page are: Grid operator: SPP; Generation queue: 186 GW; Typical time to power: about 24 months (ISO-level). Source: SPP GI active requests (MAX Summer MW, excl. cessation), published Nov 23, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.
How to read this answer
How to read it. An interconnection queue lists projects that have asked to connect and have not yet been built or withdrawn. It measures demand for grid access. It is not spare capacity and it is not a forecast of what will be built. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.
Go deeper
For more on Kansas City, open the Kansas City market page, Kansas City DCPI breakdown, or any of the data centers tracked there:
- Meta Kansas City Data Center
- Google Kansas City Data Center
- CoreWeave Independence Campus
- Google Kansas City Building 2
- Lambda Kansas City
Facility pages are taken in the order the market page lists them, each checked to load on Oct 17, 2026.