How large is the CAISO interconnection queue?

CAISO's generation interconnection queue is 165 GW as of Jul 16, 2026, as published by the ISO. The typical time to power is about 40 months (ISO-level).

Grid operatorCAISO
Generation queue165 GW
Typical time to powerabout 40 months (ISO-level)

Source: CAISO queue reports: Public Queue Report (ACTIVE, Net MWs to Grid) + Cluster 15 + Cluster 16 (NET MW POI), published Jul 16, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.

Cite as: DC Hub (dchub.cloud), "How large is the CAISO interconnection queue?", https://dchub.cloud/ai-answers/caiso-interconnection-queue, as of Jul 16, 2026.

The figures and their dates

As of Jul 16, 2026, the figures on this page are: Grid operator: CAISO; Generation queue: 165 GW; Typical time to power: about 40 months (ISO-level). Source: CAISO queue reports: Public Queue Report (ACTIVE, Net MWs to Grid) + Cluster 15 + Cluster 16 (NET MW POI), published Jul 16, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.

How to read this answer

How to read it. An interconnection queue lists projects that have asked to connect and have not yet been built or withdrawn. It measures demand for grid access. It is not spare capacity and it is not a forecast of what will be built. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.