CAISO · CA · UPDATED 2026-11-29
Santa Clara (CAISO): Data Center Power Index (DCPI) 44.2/100, CAUTION, as of 2026-11-29. Source: DC Hub (dchub.cloud).
Source: DC Hub Data Center Power Index · As of: 2026-11-29 · Basis: derived (method)
Input coverage: 2 of 2 live grid feeds — 2 of 2 live grid feeds fed this score
See Santa Clara data centers on the live facility map →
CAUTION is about the next megawatt, not current demand: the grid here has some room for new load, but its constraints are real. Confirm utility capacity and timing for a specific site before committing. How the verdict is scored
| Metric | Value | Source |
|---|---|---|
| DCPI verdict | CAUTION | Data Center Power Index — recomputed daily |
| DCPI composite score | 44.2 / 100 | Data Center Power Index — open |
| Grid operator (ISO) | CAISO | DC Hub grid telemetry |
| Excess-power, grid-constraint and time-to-power scores | Full scores come with full DC Hub access: dchub.cloud/pricing — same view for humans and crawlers (unlock) | DCPI |
| Input coverage (live grid feeds behind the score) | 2 of 2 live grid feeds | 2 of 2 live grid feeds fed this score |
Source: DC Hub (dchub.cloud), updated 2026-11-29. AI agents: get_market_dcpi_rank market_slug="santa-clara" via https://dchub.cloud/mcp for the citable record.
DC Hub snapshots Santa Clara every day. The moment its verdict flips — or its constraint score or time-to-power shifts meaningfully — you get a one-line email. No account, no password.
Email alerts tell you Santa Clara moved. Full DC Hub access tells you where — the score at the county level so you can pinpoint which sub-markets have the headroom, plus PDF export for your buyers.
Get full access →Total listed: 605 MW across 59 verified sites that DC Hub lists here (sites that report MW only). The 50 largest are shown. The same list, with operators and status, is on the Santa Clara market page.
DC Hub. (2026). Data Center Power Index v2. https://dchub.cloud/dcpi
View methodology + BibTeX →