COMPARISON BRIEF · SOURCES

Sources for the DC Hub comparison brief

These are the 24 numbered sources on page 2 of DC Hub vs. the data center intelligence field (rev. 3), with the 46 links the PDF attaches to them. Each label is the brief's own wording. Access dates: September 26–27, 2026 (rev. 3 additions October 19–20, 2026). Download the brief (PDF).

  1. S&P Global, “Completes Acquisition of datacenterHawk,” Sept 1, 2026Accessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  2. Leeds Equity Partners, datacenterHawk sale, PR Newswire, July 28, 2026Accessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  3. DC Hub MCP server and tool list (get_changes, set_site_alert)Accessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  4. DC Hub pricing, dchub.cloud/pricingAccessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  5. DC Hub, State of Data Center Power, dchub.cloud/state-of-powerAccessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  6. Data Center Power Index (DCPI) and methodology, dchub.cloud/dcpiAccessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  7. datacenterHawk homepage, platform, public API docs, demoAccessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  8. Data Center Gas Index (DCGI), dchub.cloud/dcgi; corrections recordAccessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  9. InfraXmedia, DCD (founded 1998); Bowmark stake, Aug 17, 2026Accessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  10. DCD Intelligence platformAccessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  11. EndeavorB2B, DCF acquisition, Mar 4, 2022; DCF homeAccessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  12. Baxtel, AboutAccessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  13. Baxtel datasets (11,100+ tracked), world marketAccessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  14. DC Byte Map Search (8,500+ projects under review), Site Selector, IndexAccessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  15. DC Byte, Kester Capital majority stake, Dec 20, 2022; CEO Bernard Johnson, Feb 2025Accessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  16. DC Byte, LinkedIn post listing API access, Apr 28, 2026Accessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  17. DC Hub canonical figures, dchub.cloud/api/v1/canon/phrasesAccessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  18. DC Hub grid (5-minute refresh), data sources; EIA-930 (hourly)Accessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  19. DC Hub queue by ISO, dchub.cloud/interconnection-queueAccessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  20. CBRE Global DC Trends 2026; N. America H1 2026, H2 2025; H1 2026 releaseAccessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  21. JLL 2026 Global DC Outlook (Jan 6); N. America Midyear 2026 (Aug 11); jll.com/llms.txtAccessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  22. Structure Research reports list; 2026 Colocation and Tiering releaseAccessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  23. S&P Marketplace, 451 Research DC Knowledge Base; S&P 10-Q, Q2 2026Accessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)
  24. Cushman & Wakefield, 2026 Global Data Center Market Comparison, May 20, 2026Accessed September 26–27, 2026 (rev. 3 additions October 19–20, 2026)

Other pages checked for this edition

These primary pages were also fetched on September 27, 2026 while fact-checking this edition. They are not cited in the PDF. Each is keyed to the numbered source it was checked against.

Prepared by DC Hub; DC Hub figures are self-reported. Competitor details from public sources, each listed below with its access date; corrections welcome at dchub.cloud/contact.