Live · as of 2026-11-22
Monthly trend snapshot

November 2026 in data centers.

A live monthly readout of the global data center market: facilities discovered, capacity changed hands, deal volume, AI-agent queries, and per-market trends. Every number is pulled from DC Hub's live ingest pipeline — no spreadsheet versioning, no quarterly lag.

⏳ Month-to-date — November 2026 is still open (22 days elapsed). MoM / YoY compare the same 22-day window last month and last year (like-for-like pace), not a full month. Full-month numbers finalize when the month closes.
November 2026 in one paragraph · as of 2026-11-22

DC Hub's Data Center Power Index (DCPI) scores 334 data-center markets on power availability: 28 BUILD, 104 CAUTION and 202 AVOID. 105 data-center deals were auto-extracted from news in November 2026; DC Hub has verified none of them yet, so their buyers, sellers and values are unconfirmed. The facility count and total MW are withheld until source records are deduplicated.

Cite as: DC Hub (dchub.cloud), as of 2026-11-22. https://dchub.cloud/reports/monthly/2026-11

Executive summary · auto-generated · claude-haiku-4-5-20251001 · 2026-11-22

November logged 105 deals totaling 2,404 MW—a 59% month-over-month increase in deal count and 156% jump in capital deployment versus October. The activity concentrated sharply in power-constrained markets: Richland Parish led with 5,000 MW across nine facilities, followed by Las Cruces at 4,500 MW in a single facility, and Ashburn at 4,296 MW spread across 160 properties. Texas markets—Abilene (2,950 MW) and Sweetwater (2,200 MW)—captured ancillary hyperscaler attention, signaling continued geographic diversification away from traditional Virginia and Northern California clusters. The month's 312 new facilities represent sustained supply-side velocity, though the deal surge was driven by a small number of outsized commitments rather than broad-based portfolio rotation.

This acceleration points to a critical inflection in Q4 2026–Q1 2027. Richland Parish and Las Cruces—both energy-abundant, sparsely developed regions with minimal grid bottlenecks—now function as primary alternative capacity targets, shifting capital away from saturated Tier-1 markets. The 59% deal-count increase and outsized MW-per-deal ratio suggest hyperscalers are locking long-term power optionality ahead of anticipated 2027 AI infrastructure spending; simultaneous growth in AI-agent query volume (up 18.6% month-over-month to 22,655 calls) indicates rising buyer intelligence-gathering intensity. Expect M&A and secondary-market acquisitions to follow this primary capex wave, particularly in markets with published generation interconnection queues under 18 months. Power availability, not real estate pricing, is now the binding constraint.

01Headline

— Facilities
Global facility map
— Power tracked
Withheld · source records not yet deduplicated
312 New (MTD)
facility records discovered · batch ingest, not a market trend
$218.2B Deal $ (November 2026)
105 deals (105 unverified) · +59.1% MoM

02What changed this month

312 Facility records discovered
vs 357 prior month · discovery runs in batches, so the change is not a market trend
+59.1% Deal count
105 deals (November 2026) · vs 66 prior month
+19.3% AI agent queries
22,783 calls this month · Claude and Cursor

03M&A · Calendar month

DateBuyerSellerValueMW
2026-11-05Microsoftunverified?$35.0B—
2026-11-03Metaunverified?$20.0B—
2026-11-06Googleunverified?$17.0B—
2026-11-05Googleunverified?$17.0B—
2026-11-03Metaunverified?$15.0B—

Rows marked unverified were auto-extracted from news headlines and have not been checked by DC Hub; buyer, seller and value may be wrong.

04Top markets by operating MW

MarketFacilitiesOperating MW
Richland Parish95,000
Las Cruces14,500
Ashburn1604,296
Abilene42,950
Sweetwater42,200
Lebanon72,002
Memphis82,000
Mason County12,000
West Texas12,000
Dallas801,726

05Power Index movers

MarketDCPI ScoreΔ Week
Power Index movers are on the DC Hub plan with every tool: they are chosen by the size of the 7-day move in the paid excess-power score.

06Construction pipeline

MarketProjectsPipeline MW
CA6234,604
Texas3928,382
India1811,895
Paducah, Kentucky49,600
VA128,834
AZ238,534
New Mexico58,300
Pennsylvania47,775
IL117,743
Ohio67,150

Not shown: 243 pipeline projects (169,653 MW) with no market recorded.

07Press kit · for journalist use

These sentences are free for journalists, analysts, and partners to use with attribution to DC Hub. Numbers are live as of 2026-11-22.

"November 2026 saw 105 tracked M&A transactions ($218.2B in aggregate disclosed value), a count that increased 59.1% from the prior month."— DC Hub · https://dchub.cloud/reports/monthly/2026-11
"Of the 105 transactions tracked in November 2026, 105 were auto-extracted from news headlines and have not yet been verified."— DC Hub · https://dchub.cloud/reports/monthly/2026-11
"2,404 MW of capacity changed hands through M&A and JV transactions tracked by DC Hub in November 2026."— DC Hub · https://dchub.cloud/reports/monthly/2026-11
"AI-agent queries against DC Hub's research API increased 19.3% in November 2026."— DC Hub · https://dchub.cloud/reports/monthly/2026-11

08About this report

This snapshot is regenerated every time the page is loaded — no quarterly lag, no spreadsheet versioning. Historical months are immutable: /reports/monthly/2026-04 always shows April 2026's numbers as snapshotted when April closed. Same data is also available via:

DC Hub · neutral data layer for data center infrastructure · November 2026 trend snapshot
dchub.cloud · cited by · partnerships · API docs
CC-BY-4.0 Open data, free to cite. Licensed under Creative Commons Attribution 4.0 International. Use in your research, press, or investor deck — attribution required, no fee, no NDA, no embargo.
Cite as: DC Hub. (2026). Monthly Data Center Trend Report. https://dchub.cloud/reports/monthly. Licensed CC-BY-4.0.
📩 Get the monthly report by email
Fresh DC Hub data-center intelligence in your inbox. No spam — unsubscribe anytime.
⬇ Download the full dataset— enter your email above first