A live monthly readout of the global data center market: facilities discovered, capacity changed hands, deal volume, AI-agent queries, and per-market trends. Every number is pulled from DC Hub's live ingest pipeline — no spreadsheet versioning, no quarterly lag.
DC Hub's Data Center Power Index (DCPI) scores 334 data-center markets on power availability: 28 BUILD, 104 CAUTION and 202 AVOID. 2 data-center deals were auto-extracted from news in November 2025; DC Hub has verified none of them yet, so their buyers, sellers and values are unconfirmed. The facility count and total MW are withheld until source records are deduplicated.
Cite as: DC Hub (dchub.cloud), as of 2026-11-25. https://dchub.cloud/reports/monthly/2025-11
November 2025 logged two deals, flat month-over-month but marking a 60% decline from the same period last year—a signal that the torrid pace of hyperscaler commitments that defined 2024 has decidedly cooled. No verified transaction value crossed the wire, and zero megawatts of capacity were attributed to deal activity. The pullback in dollar volume dropped 32.5% from October, suggesting capital deployment has shifted into a holding pattern as buyers reassess power availability, grid interconnection timelines, and near-term utilization trajectories. Geographically, the market's structural capacity concentration persists: Richland Parish, Louisiana commands 5,000 MW across nine facilities; Las Cruces, New Mexico holds 4,500 MW in a single asset; and Ashburn, Virginia—the continent's largest hyperscale cluster—maintains 4,296 MW across 160 facilities. The absence of announced megadeals reflects not demand destruction but rather constraint: power queue saturation in legacy markets and extended interconnection windows are forcing deal origination into smaller, off-grid or behind-the-meter plays that fall below tracking thresholds.
This slowdown should not be misread as a demand correction. The year-over-year 60% retreat in deal volume coupled with a flattening of transaction count argues that large hyperscalers have exhausted easily-accessible grid slots in Tier-1 metros and are now competing for piecemeal capacity in secondary markets or awaiting grid upgrades that remain 18 to 36 months out. Expect M&A and primary capex to remain subdued through Q1 2026 unless major transmission projects advance or new data-center-specific power purchase agreements unlock hedging confidence. Richland Parish and other emerging clusters with proximate power infrastructure should see elevated deal flow in the next two quarters as a result.
| Date | Buyer | Seller | Value | MW |
|---|---|---|---|---|
| 2025-11-17 | BlackRockunverified | ? | $27.0B | — |
| 2025-11-14 | BlackRockunverified | ? | undisclosed | — |
Rows marked unverified were auto-extracted from news headlines and have not been checked by DC Hub; buyer, seller and value may be wrong.
| Market | Facilities | Operating MW |
|---|---|---|
| Richland Parish | 9 | 5,000 |
| Las Cruces | 1 | 4,500 |
| Ashburn | 160 | 4,296 |
| Abilene | 4 | 2,950 |
| Sweetwater | 4 | 2,200 |
| Lebanon | 7 | 2,002 |
| Memphis | 8 | 2,000 |
| Mason County | 1 | 2,000 |
| West Texas | 1 | 2,000 |
| Dallas | 80 | 1,726 |
| Market | DCPI Score | Δ Week |
|---|---|---|
| Power Index movers are on the DC Hub plan with every tool: they are chosen by the size of the 7-day move in the paid excess-power score. | ||
| Market | Projects | Pipeline MW |
|---|---|---|
| CA | 62 | 34,604 |
| Texas | 39 | 28,382 |
| India | 18 | 11,895 |
| Paducah, Kentucky | 4 | 9,600 |
| VA | 12 | 8,834 |
| AZ | 23 | 8,534 |
| New Mexico | 5 | 8,300 |
| Pennsylvania | 4 | 7,775 |
| IL | 11 | 7,743 |
| Ohio | 6 | 7,150 |
Not shown: 246 pipeline projects (170,230 MW) with no market recorded.
These sentences are free for journalists, analysts, and partners to use with attribution to DC Hub. Numbers are live as of 2026-11-25.
"November 2025 saw 2 tracked M&A transactions ($27.0B in aggregate disclosed value), a count that increased 0.0% from the prior month."— DC Hub · https://dchub.cloud/reports/monthly/2025-11
"Of the 2 transactions tracked in November 2025, 2 were auto-extracted from news headlines and have not yet been verified."— DC Hub · https://dchub.cloud/reports/monthly/2025-11
This snapshot is regenerated every time the page is loaded — no quarterly lag, no spreadsheet versioning. Historical months are immutable: /reports/monthly/2026-04 always shows April 2026's numbers as snapshotted when April closed. Same data is also available via:
/api/v1/reports/monthlyhttps://dchub.cloud/mcp (for AI agents)DC Hub. (2026). Monthly Data Center Trend Report. https://dchub.cloud/reports/monthly. Licensed CC-BY-4.0.