A live monthly readout of the global data center market: facilities discovered, capacity changed hands, deal volume, AI-agent queries, and per-market trends. Every number is pulled from DC Hub's live ingest pipeline — no spreadsheet versioning, no quarterly lag.
DC Hub's Data Center Power Index (DCPI) scores 334 data-center markets on power availability: 28 BUILD, 104 CAUTION and 202 AVOID. DC Hub tracked 1 data-center deals in May 2022, 1 of them verified ($1.0B verified value). The facility count and total MW are withheld until source records are deduplicated.
Cite as: DC Hub (dchub.cloud), as of 2026-11-26. https://dchub.cloud/reports/monthly/2022-05
May 2022 logged one deal totaling $1 billion across 200 MW, with Microsoft's acquisition of Wisconsin Campus capacity representing the month's sole significant capital deployment. While transaction volume remained thin, the deal underscores hyperscalers' continued willingness to deploy large checks for ready power in constrained markets. The verified transaction landed outside the top five power markets by installed base—Richland Parish (5,000 MW across 9 facilities), Las Cruces (4,500 MW), and Ashburn (4,296 MW across 160 facilities) remain the dominant poles of installed capacity—suggesting Microsoft prioritized access over geography, a signal that power availability rather than cost arbitrage is driving acquisition strategy.
This pattern points to tightening power allocation in the near term. The absence of competing bids and the singular-deal month indicate that available dark fiber and shovel-ready power are becoming gatekeepers for hyperscale expansion. Over the next two quarters, expect M&A to remain sporadic but dollar-heavy as hyperscalers chase projects with existing interconnection queue depth and firm grid slots, particularly in Richland Parish and Las Cruces where single-facility or small-cluster ownership may offer faster control. Capacity pipelines will matter less than power-on dates; markets with 18-month-to-operation timelines will command premiums over greenfield sites with longer lead times.
| Date | Buyer | Seller | Value | MW |
|---|---|---|---|---|
| 2022-05-01 | Microsoft | Wisconsin Campus | $1.0B | 200 |
| Market | Facilities | Operating MW |
|---|---|---|
| Richland Parish | 9 | 5,000 |
| Las Cruces | 1 | 4,500 |
| Ashburn | 160 | 4,296 |
| Abilene | 4 | 2,950 |
| Sweetwater | 4 | 2,200 |
| Lebanon | 7 | 2,002 |
| Memphis | 8 | 2,000 |
| Mason County | 1 | 2,000 |
| West Texas | 1 | 2,000 |
| Dallas | 80 | 1,726 |
| Market | DCPI Score | Δ Week |
|---|---|---|
| Power Index movers are on the DC Hub plan with every tool: they are chosen by the size of the 7-day move in the paid excess-power score. | ||
| Market | Projects | Pipeline MW |
|---|---|---|
| CA | 62 | 34,604 |
| Texas | 39 | 28,382 |
| India | 18 | 11,895 |
| Paducah, Kentucky | 4 | 9,600 |
| VA | 12 | 8,834 |
| AZ | 23 | 8,534 |
| New Mexico | 5 | 8,300 |
| Pennsylvania | 4 | 7,775 |
| IL | 11 | 7,743 |
| Ohio | 6 | 7,150 |
Not shown: 246 pipeline projects (170,230 MW) with no market recorded.
These sentences are free for journalists, analysts, and partners to use with attribution to DC Hub. Numbers are live as of 2026-11-26.
"In May 2022, DC Hub tracked 1 M&A transactions worth $1.0B in aggregate disclosed value."— DC Hub · https://dchub.cloud/reports/monthly/2022-05
"200 MW of capacity changed hands through M&A and JV transactions tracked by DC Hub in May 2022."— DC Hub · https://dchub.cloud/reports/monthly/2022-05
This snapshot is regenerated every time the page is loaded — no quarterly lag, no spreadsheet versioning. Historical months are immutable: /reports/monthly/2026-04 always shows April 2026's numbers as snapshotted when April closed. Same data is also available via:
/api/v1/reports/monthlyhttps://dchub.cloud/mcp (for AI agents)DC Hub. (2026). Monthly Data Center Trend Report. https://dchub.cloud/reports/monthly. Licensed CC-BY-4.0.