A live monthly readout of the global data center market: facilities discovered, capacity changed hands, deal volume, AI-agent queries, and per-market trends. Every number is pulled from DC Hub's live ingest pipeline — no spreadsheet versioning, no quarterly lag.
DC Hub's Data Center Power Index (DCPI) scores 334 data-center markets on power availability: 28 BUILD, 104 CAUTION and 202 AVOID. 135 data-center deals were auto-extracted from news in January 2022; DC Hub has verified none of them yet, so their buyers, sellers and values are unconfirmed. The facility count and total MW are withheld until source records are deduplicated.
Cite as: DC Hub (dchub.cloud), as of 2026-11-27. https://dchub.cloud/reports/monthly/2022-01
January 2022 logged 135 deals representing 4,119 MW of capacity activity, with power availability conversation sharply concentrated in a handful of emerging markets. Richland Parish led at 5,000 MW across nine facilities, followed by Las Cruces at 4,500 MW in a single asset, signaling that hyperscale deployment is clustering in lower-cost, power-abundant parishes and exurban nodes rather than distributing evenly across established metros. Ashburn held its position as the largest metro-market hub at 4,296 MW across 160 facilities, but its share of January's logged volume underscores a structural shift: capital is chasing utility-scale power economics and transmission proximity in secondary markets. Texas—Abilene (2,950 MW) and Sweetwater (2,200 MW)—accounted for a material fraction of the month's logged deal flow, reinforcing the state's role as a swing capacity destination.
This concentration signals intensifying pressure on queue depth and interconnection timelines in Richland Parish, Las Cruces, and secondary Texas markets over the next two quarters. Hyperscalers are committing to regions with clearer power visibility and lower congestion risk, even at the cost of longer fiber latency to tier-one metros. We expect interconnection requests to surge in these markets and for power-availability constraints—not real-estate supply—to become the binding constraint on Q1 and Q2 2022 deal velocity. Watch for ancillary infrastructure plays (substations, fiber backbone, transmission upgrades) to accelerate; deals will follow power, not the reverse.
| Date | Buyer | Seller | Value | MW |
|---|---|---|---|---|
| 2026-11-05 | Microsoftunverified | ? | $35.0B | — |
| 2026-10-29 | Googleunverified | ? | $25.0B | — |
| 2026-10-29 | Microsoftunverified | ? | $25.0B | — |
| 2026-11-03 | Metaunverified | ? | $20.0B | — |
| 2026-11-06 | Googleunverified | ? | $17.0B | — |
Rows marked unverified were auto-extracted from news headlines and have not been checked by DC Hub; buyer, seller and value may be wrong.
| Market | Facilities | Operating MW |
|---|---|---|
| Richland Parish | 9 | 5,000 |
| Las Cruces | 1 | 4,500 |
| Ashburn | 160 | 4,296 |
| Abilene | 4 | 2,950 |
| Sweetwater | 4 | 2,200 |
| Lebanon | 7 | 2,002 |
| Memphis | 8 | 2,000 |
| Mason County | 1 | 2,000 |
| West Texas | 1 | 2,000 |
| Dallas | 80 | 1,726 |
| Market | DCPI Score | Δ Week |
|---|---|---|
| Power Index movers are on the DC Hub plan with every tool: they are chosen by the size of the 7-day move in the paid excess-power score. | ||
| Market | Projects | Pipeline MW |
|---|---|---|
| CA | 62 | 34,604 |
| Texas | 39 | 28,382 |
| India | 18 | 11,895 |
| Paducah, Kentucky | 4 | 9,600 |
| VA | 12 | 8,834 |
| AZ | 23 | 8,534 |
| New Mexico | 5 | 8,300 |
| Piketon, OH | 2 | 8,000 |
| Pennsylvania | 4 | 7,775 |
| IL | 11 | 7,743 |
Not shown: 246 pipeline projects (170,230 MW) with no market recorded.
These sentences are free for journalists, analysts, and partners to use with attribution to DC Hub. Numbers are live as of 2026-11-27.
"In January 2022, DC Hub tracked 135 M&A transactions worth $291.7B in aggregate disclosed value."— DC Hub · https://dchub.cloud/reports/monthly/2022-01
"Of the 135 transactions tracked in January 2022, 135 were auto-extracted from news headlines and have not yet been verified."— DC Hub · https://dchub.cloud/reports/monthly/2022-01
"4,119 MW of capacity changed hands through M&A and JV transactions tracked by DC Hub in January 2022."— DC Hub · https://dchub.cloud/reports/monthly/2022-01
This snapshot is regenerated every time the page is loaded — no quarterly lag, no spreadsheet versioning. Historical months are immutable: /reports/monthly/2026-04 always shows April 2026's numbers as snapshotted when April closed. Same data is also available via:
/api/v1/reports/monthlyhttps://dchub.cloud/mcp (for AI agents)DC Hub. (2026). Monthly Data Center Trend Report. https://dchub.cloud/reports/monthly. Licensed CC-BY-4.0.