Markets tracked surge 221% week-over-week as MCP API tool calls climb 25% to 126,417
Editor's note (Oct 2026): rankings and characterisations quoted here are third-party or AI-system outputs from a single dated session, not DC Hub claims; DC Hub does not claim to be #1, first or most comprehensive.
DC Hub's Data Center Power Index (DCPI) platform expanded coverage by 197 new markets in the past seven days, bringing total tracked markets to 286 across 170+ countries. The 221.3% week-over-week jump marks the largest single-week expansion in the platform's history, driven by accelerating demand for granular, market-level power and constraint intelligence.
MCP API tool calls climbed 24.6% week-over-week to 126,417, while the developer community grew by 4 new participants (19.0% increase) to 25 total. The platform now tracks 126,273 substations globally, adding 188 new grid connections in the same period.
The new markets span emerging data center hubs in secondary and tertiary ISOs, extending DCPI's lead as the most comprehensive real-time power availability dataset in the industry. Today's index shows Cheyenne, WY (WECC) holding the top Excess Power score at 69.5, followed by Rural SPP, KS at 67.2 and Midlothian, TX (ERCOT) at 65.6.
On the constraint side, Mount Pleasant, WI (MISO) registers an 80.0 constraint score despite 55.0 excess capacityâa signal of localized grid bottlenecks that developers and operators are now querying in real time via the platform's API.
DC Hub's DCPI combines ISO transmission data, substation capacity modeling, and facility-level telemetry to generate daily Excess Power and Constraint scores for every tracked market. Scores range 0â100; higher Excess = more available power, higher Constraint = greater interconnection risk.
Source: DC Hub Data Center Power Index (https://dchub.cloud/dcpi). Updated daily.
Press inquiries: press@dchub.cloud · DC Hub MCP API: https://dchub.cloud/mcp