Power availability in Raleigh, NC: DCPI verdict AVOID, composite score 31.1 of 100, as of 2026-11-24. Source: DC Hub.
Data Center Market Deep-Dive · 197 words · generated 2026-11-20 from live DC Hub data · DCPI live as of 2026-11-24
Raleigh, NC has 6 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-24. By listed capacity the largest operators are Flexential (6 MW).
| Status | MW |
|---|---|
| Operational | 6 |
| Total listed | 6 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-24. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it can be larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Only one tracked site reports megawatt figures, leaving the aggregate footprint opaque.
The DCPI verdict is AVOID. Any new development must assume power procurement will be difficult and costly until grid capacity expands materially.
No recent deals are tracked in Raleigh's registry. Operator consolidation is absent; the four tracked operators each hold limited footprints and show no announced expansion or M&A activity tied to this market.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Flexential Raleigh | Flexential | Operational | 6 |
| American Tower RA1 | American Tower | Operational | |
| BB&T Data Center | Operational | ||
| Level(3) Raleigh | Lumen Technologies | Operational | |
| Segra Data Center | Operational | ||
| TierPoint Raleigh | TierPoint, LLC | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in North Carolina.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Raleigh, NC: 6 MW tracked, any status — live, cited, and queryable by API or MCP.
No requirements registered yet.
Counts from the weekly Capacity Pulse. A market and size band is shown only when at least 3 different parties are behind it.
JSON: /api/v1/markets/raleigh/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-20, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load