xAI Colossus 1

Colossus 1 is a data center operated by xAI in Memphis, TN, US. Its reported power capacity falls in the 100–500 MW range and it is currently operational.

Power
100–500 MW
Status
Operational
City
Memphis
State
TN
Country
US

Source: DC Hub facilities registry · Added , not re-checked since · Basis: cited (what this means)

Market intelligence

AVOID

Memphis

Power outlook → Memphis market page →

Market context

xAI Colossus 1 is one of 33 facilities DC Hub’s Memphis brief counts on the TVA grid. The closest tracked facility is GROOT, LLC., about 12 km away, and the nearest mapped substation is within 1 km. Read the Memphis market brief →

Location

Area Memphis, TN, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationMemphis, US
Reported capacity100–500 MW
Nearest substationwithin 1 km

Power generation nearby

DC Hub tracks 16 operating generating units totalling 3,473 MW within about 50 km of Memphis, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,936 MW · 8 units · 85%
Utility-Scale Solar536 MW · 8 units · 15%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Unlock power scores for this site → MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP over Streamable HTTP at https://dchub.cloud/mcp; call execute_plan with this page's question for one dated, cited answer. You can also query get_facility slug="xai-colossus-1-11af72b0". Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind