COLOSSUS DATA CENTER is a data center in MEMPHIS, TN. It sits in the Memphis data-center market on the TVA grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 10.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Memphis — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Memphis — the market this facility sits in (full deep-dive →).
Memphis operates a 5,617 MW installed base across 30 tracked facilities, but faces a structural underinvestment in power delivery relative to capacity demand. The excess-power score of 38/100 signals that available generation and transmission cannot reliably support expansion, while the constraint rating of 28/100—among the lowest quartile nationally—indicates severe interconnection and infrastructure bottlenecks. This combination reflects a market where existing capacity exceeds reliable delivery infrastructure, creating a ceiling on profitable utilization. The AVOID verdict is unambiguous for acquisition-focused investors. A constraint score of 28/100 means purchasing operational assets faces substantial risk of power-delivery delays, upgrade costs borne by operators, and potential production limitations during peak demand periods. Any acquisition would require budgeting for grid…
Published DC Hub data for this location.
get_facility slug="colossus-data-center-ca8b7cfc" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=colossus-data-center-ca8b7cfc